
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
38
FieldSmart
®
Fiber Distribution Hub (FDH)
Installation Manual
_________________________________________________________
Manual 019703 REV B - March 2019
Prep the cable according to the instructions provided earlier in the manual
and your local rules for mid-span cable opening.
Note:
This kit will enable the cable to be prepped using either a mid-span
opening or the end of the cable.
1.
Locate the green clamp shells and corresponding 1/4-20 mounting
screws from the ship-along hardware.
The clamp shells are used in same-size pairs. Avoid using a clamp that
is too small and does not easily close around the cable. Use the next
larger clamp and grommet tape. Grommet tape should be applied to the
green clamp shell prior to installation.
2.
Locate the height that is required to install the cable and mark the cable
jacket where the cable passes through the floor of the cabinet. Be sure
to leave at least 3” to 4” above the cabinet floor.
3.