
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
36
FieldSmart
®
Fiber Distribution Hub (FDH)
Installation Manual
_________________________________________________________
Manual 019703 REV B - March 2019
Staging Area
Splitter Cages
864 Port FDH
1.
2.
3.
4.
If applicable, replace the foam cradle around the staging plate with the
foam strips provided with the splitter, as shown by the install manual
included with the splitter.
Place the splitter body into the splitter cage, in the outermost location,
and secure in place using the velcro straps.
Route the splitter legs up and around the center spools and radius fin
-
gers until the staging plate is ready to be placed into the staging area.
Clearfield recommends following the routing diagram shown here.
Install the staging plate into its place, first inserting the tabs of the
staging plate into the innermost bracket and then pressing the opposite
side until the staging plate is fully seated.
Note:
Each half of the 864 cabinet can house 3 staging plates at a
time.
5.
6.
Proceed to connecting the
feeder and distribution legs
of the splitter as needed.
Choose your desired port
to connect the splitter leg.
Clearfield recommends you
reference the routing diagram
and designation card shown
here and in the cabinet. Each
port will have a color, corre-
sponding to the radius spool
that the splitter leg must route
over to properly take up the
slack before connection.
Record the splitter leg
number on the designation
card in the correct cell.