
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
14
FieldSmart
®
Fiber Distribution Hub (FDH)
Installation Manual
_________________________________________________________
Manual 019703 REV B - March 2019
Bagged bolt kit (P/N 009092) will be
attached to the underside of the vault
lid via two zip ties using these two
pre-drilled base mounting holes.
Mounting Base to CraftSmart HDPE Lids
Locate the bolt hardware kit, supplied with each CraftSmart vault that have cut outs for the FieldSmart FDH Cabinets.
All CraftSmart HDPE Vault Lids come with a pre-cut cable entrance hole and pre-drilled base mounting holes, so no drilling
is required in the field.
24 x 36 Vault (144 & 288 FDH):