E
N
G
LI
S
H
Pool’s edge
Top ring
View from above
b) Assembling the pool and filling it with water
When you have chosen a suitable location you can proceed to the instructions for
assembling the pool. We strongly recommend that two people help one another to
assemble the pool.
a) If the pool comes with a groundsheet, open it up and lay it on the ground you have
chosen for the pool. Make sure that the groundsheet is flat, not creased or folded.
Make sure that the pump mains lead has a safe route to the mains outlet.
b)
WARNING!
Only connect the filter pump to an earthed mains outlet equipped with
a RCD. Do not use an extension lead. Do not start the pump until the pool is filled.
Never run the filter pump when someone is in the pool. Do not run the pump for more
than 48 hours at a time and make sure that both the pump and adaptor are cool
before use. Remember to clean or change the cartridge regularly (see “Cleaning/
changing the filter”). Make sure that the drainage plug is in a suitable position for
Draining the pool.
c) Unpack the pool and lay it in the middle of the groundsheet. NOTE! Do not drag the
pool, this could rip or damage it. If the pool does rip, look in the troubleshooting guide
for suggested solutions.
d) Spread out the pool as evenly as possible. Tip! The pool will be easier to assemble
if you leave it spread out in direct sunlight for a couple of hours first. This softens the
pool material, allowing it to take shape more easily during inflation.
e) Inflate the ring on the edge of the pool with air and then hold it in the middle of the
pool. The upper ring air valve is next to the warning label. When filling, pinch the
valve closest to the pool to open a safety valve inside the air valve.
IMPORTANT:
The upper ring should be inflated to about 85% capacity. Do not attempt
to inflate it more than this. If you inflate it too much the ring can split at the seams.