International
9
Transport, storage
Note
The packed item should be stored under a roof or, if stored in a free area, with
an appropriate cover (tarpaulin etc.). For transport and storage, all items and
packing must be free from defects.
Installation
Foundation
The foundation must be laid as described in the section ‘Installation, Foundation’
(see also Fig. 3). Unpacking the lift and accessories: after the packaging has
been opened, the contents of the shipment should be controlled using the
‘Machine Book’. Complete unpacking is only recommended shortly before
installation.
Installation instructions for the lift
Mount the base frame to the properly prepared foundation as shown in Fig. 3
using screws (anchors). Lay the lifting posts on the anchored base frame. Put up
the posts and preliminarily fix them using bolts M14 x 50; for preliminary fixing,
only the first five threads of the screws should be screwed in (five full turns). Then
insert the chain. This step will be made easier by tilting the preliminarily fixed
posts back.
ATTENTION!
Before the chain is inserted, ensure that both carriages are at the same height
(approx 800 mm), then, the post with motor may be installed.
The control cable is included in a separate package (coiled by manufacturer). The
cable is inserted, beginning at the post with motor.
At the side of the motor, mount the threaded rod in a centre position with the cable
down, then, from the right-hand side, lead the cable over the cable roller at the
carriage and then up over the cable roller at the control rod into the hollow of the
post. Lead the cable down through the hole in the post footing and then to the
opposite post. Enter it through the hole in the post footing again, and lead it upwards
until you can fix it to the control rod using a connection block (from terminal strip)
(see Fig. 6).
The fine adjustment is done over the threaded rod at the control rod on the motor
side. The control cable is adjusted correctly when the red mark of the control rod is
located at the centre of the emergency switch roller (see Fig. 8).
TRANSPORT/ INSTALLATION
Содержание Strong-Arm CPL30T
Страница 2: ...International 2...
Страница 22: ...International 22 Figure 1 MAIN COMPONENTS...
Страница 23: ...International 23 Figure 2 DIMENSIONS...
Страница 24: ...International 24 Figure 3 GROUND PLAN DIMENSIONS SWIVEL RANGE...
Страница 25: ...International 25 Figure 4 CIRCUIT DIAGRAM...
Страница 26: ...International 26 Figures 5 6 CONTROL BOX CONTROL CABLE...
Страница 27: ...International 27 Figure 7 POWER SUPPLY 1...
Страница 28: ...International 28 Figure 8 CONTROL ROD...
Страница 29: ...International 29 Figure 9 OIL TANK for spindle lubrication...
Страница 30: ...International 30 Figure 10 SUPPORTING SAFETY NUT...
Страница 31: ...International 31 Figure 11 CARRIAGE...
Страница 32: ...International 32 CARRIAGE Figure 12...
Страница 33: ...International 33 Figure 13 SWIVEL ARM SHORT...
Страница 34: ...International 34 Figure 14 SWIVEL ARM LONG...
Страница 35: ...International 35 Figure 15 PARTS DIAGRAM...
Страница 40: ...International 40...