Page 13
Gas Pipe Size Chart
TOTAL BTU/HR
(for LP Gas correct
total Btu/h below by
multiplying by .6)
TOTAL
KCAL
H O U R
GAS PIPE SIZE FOR 1000 Btu (252 kcal/h) NATURAL GAS
AT 7” w. c. (17.5 bar) PRESSURE
In figuring total length of pipe, make allowance for tees and elbows.
(150 ft.)
45,72 m
(125 ft.)
38,1 m
(100 ft.)
30,48 m
(75 ft.)
22,86 m
(50 ft.)
15,24 m
(25 ft.)
7,62 m
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
900,000
1,000,000
1,100,000
1,200,000
1,300,000
1,400,000
1,500,000
1,600,000
1,700,000
1,800,000
1,900,000
2,000,000
2,200,000
2,400,000
2,600,000
2,800,000
3,000,000
3,200,000
3,400,000
3,600,000
3,800,000
4,000,000
15000
20000
25200
30200
35200
40300
45300
50400
75600
100800
126000
151200
176400
202000
230000
250000
270000
300000
330000
350000
380000
400000
430000
450000
480000
504000
550000
605000
650000
705000
750000
806000
850000
907000
960000
1000000
3/4
3/4
3/4
3/4
3/4
3/4
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
1 1/2
2
2
2
2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3/4
3/4
3/4
1
1
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3/4
3/4
1
1
1
1
1
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3/4
1
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
3/4
1
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
4
4
3/4
1
1
1
1 1/4
1 1/4
1 1/4
1 1/2
1 1/2
2
2
2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
2 1/2
3
3
3
3
3
3
3
3 1/2
3 1/2
3 1/2
3 1/2
3 1/2
4
4
4
4
4
4
Содержание C150G
Страница 11: ...Page 11 150 lb C Models Gas Fired Dryer Illustration ...
Страница 14: ...Page 14 Gas Piping Installation Illustration ...
Страница 16: ...Page 16 150 lb Steam Heated Models Illustration ...
Страница 23: ...Page 23 Dryer Installation with Multiple Exhaust Illustration ...
Страница 31: ...Page 31 Two Timer Models Figures 1 2 and 3 Illustrations ...
Страница 33: ...Page 33 Moisture Control Illustration ...
Страница 41: ...Page 41 DIRECT SPARK IGNITION OPERATION FLOW CHART ...
Страница 45: ...Page 45 Basket Alignment for 150 lb Dryers Illustrations ...
Страница 47: ...Page 47 Shimming the Basket and Spider Assembly Illustration ...
Страница 54: ...Page 54 150 lb Dryer Front of Dryer Illustration ...
Страница 56: ...Page 56 150 lb Dryer Rear of Dryer Illustration ...
Страница 67: ...Page 67 ...