Page 27
Dryer Installation with Separate Exhaust (Preferred)
For ductwork less than 14 feet (5 m) and 2 elbows equivalent and
less than 0.3 inches (8 mm) static pressure.
NEVER exhaust the dryer into a chimney.
NEVER install wire mesh screen over the exhaust or
make-up air area.
NEVER exhaust into a wall, ceiling, or concealed space.
1 .
Make-Up Air opening from outside the building may enter the
enclosure from the top or side walls. (See Dryer Make-up Air
Requirements Chart)
2 .
Enclosure (plenum) with service door. This separates the dryer
air from the room comfort air. If dryers use room air instead of
outside air, additional heat loss can be another 25 Btu/h
(6.3 kcal/h) for each cubic foot per minute (cfm) used.
3 .
Zero inches clearance to combustible material allowed on sides
and at points within 4 inches (102 mm) of front on top.
4 .
Heat loss into laundry room from dryer front panels is about
60 Btu/h (16 kcal/h) per square foot.
DRYER INSTALLATION
WITH SEPARATE
EXHAUST (PREFERRED)
Содержание C150G
Страница 11: ...Page 11 150 lb C Models Gas Fired Dryer Illustration ...
Страница 14: ...Page 14 Gas Piping Installation Illustration ...
Страница 16: ...Page 16 150 lb Steam Heated Models Illustration ...
Страница 23: ...Page 23 Dryer Installation with Multiple Exhaust Illustration ...
Страница 31: ...Page 31 Two Timer Models Figures 1 2 and 3 Illustrations ...
Страница 33: ...Page 33 Moisture Control Illustration ...
Страница 41: ...Page 41 DIRECT SPARK IGNITION OPERATION FLOW CHART ...
Страница 45: ...Page 45 Basket Alignment for 150 lb Dryers Illustrations ...
Страница 47: ...Page 47 Shimming the Basket and Spider Assembly Illustration ...
Страница 54: ...Page 54 150 lb Dryer Front of Dryer Illustration ...
Страница 56: ...Page 56 150 lb Dryer Rear of Dryer Illustration ...
Страница 67: ...Page 67 ...