![Cisco UCS C250 Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/cisco/ucs-c250/ucs-c250_installation-and-service-manual_67251074.webp)
3-38
Cisco UCS C250 Server Installation and Service Guide
OL-20888-02
Chapter 3 Maintaining the Server
Installing or Replacing Components
Replacing an LSI Battery Backup Unit
In the Cisco UCS C250 server, the battery backup unit (BBU) is installed directly onto the LSI controller
card.
Note
A cable is shipped with the BBU that is used for installing the BBU on a bracket in other server models.
Do not use this cable in the Cisco UCS C250 server; install the BBU directly onto the LSI controller
card. Connecting the extra cable causes error messages because the multiple connections are detected as
multiple BBUs (an unsupported configuration).
Note
LSI recommends that you replace the LSI BBU once per year or after 1,000 recharge cycles, whichever
comes first. Verify whether BBU replacement is required by looking in the CIMC. Log in to CIMC for
the server, then click
Server
—
Inventory
—
Storage
—
Battery Backup Unit
. If the Battery Replacement
Required field says, “True,” then you must purchase a replacement BBU and replace it.
Warning
There is danger of explosion if the battery is replaced incorrectly. Replace the battery only with the
same or equivalent type recommended by the manufacturer. Dispose of used batteries according to
the manufacturer’s instructions.
Statement 1015
To install or replace a battery backup unit (BBU), follow these steps:
Step 1
Remove a BBU:
a.
Remove the three screws that secure the BBU to the LSI controller card.
b.
Lift the BBU straight up to free its connector from the socket on the LSI controller card.
Step 2
Install a BBU:
a.
With the battery side up, set the BBU on the front of the LSI controller card.
Align the three screw-holes in the BBU with the three standoffs on the LSI controller card for
guidance.
b.
Carefully align the J5 connector on the underside of the BBU with the socket on the LSI controller
card and then press downward to fully join the J5 connector with the socket.
c.
Install the three screws that secure the BBU to the LSI controller card.
Содержание UCS C250
Страница 6: ...Contents vi Cisco UCS C250 Server Installation and Service Guide OL 20888 02 ...
Страница 12: ...xii Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Preface ...
Страница 14: ...xiv Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Preface ...
Страница 18: ...1 4 Cisco UCS C250 Server Installation and Service Guide OL 20888 02 Chapter 1 Overview ...