Verification Time and Date
Planning Activity
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the
equipment
Dedicated (separate)
circuits for power
redundancy
UPS for power failures
Grounding: proper wire
gauge and lugs
Circuit breaker size
Grounding evaluation:
Data center ground
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment
(transceivers)
EMI evaluation:
Cisco Nexus 93120TX NX-OS Mode Switch Hardware Installation Guide
56
Site Preparation and Maintenance Records
Site Preparation Checklist
Содержание Nexus 93120TX
Страница 6: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide vi Contents ...
Страница 22: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 64: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 54 LEDs Power Supply LEDs ...