Unpacking and Inspecting a New Switch
Before you install a new chassis, you need to unpack and inspect it to be sure that you have all the items that
you ordered and verify that the switch was not damaged during shipment. If anything is damaged or missing,
contact your customer representative immediately.
When you handle the chassis or its components, you must follow ESD protocol at all times to prevent
ESD damage. This protocol includes but is not limited to wearing an ESD wrist strap that you connect to
the earth ground.
Caution
Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store
them. If you need to move or ship the system in the future, you will need this container.
Tip
Step 1
Compare the shipment to the equipment list that is provided by your customer service representative and verify that you
have received all of the ordered items.
The shipment should include the following:
•
Switch chassis, which includes the following installed components:
◦
One or two power supplies (any combination of the following):
◦
Port-side intake airflow 1200-W AC power supply (N9K-PAC-1200W)
◦
Port-side exhaust airflow 1200-W AC power supply (N9K-PAC-1200W-B)
◦
Port-side intake airflow 930-W DC power supply (UCSC-PDU-930WDC)
◦
Two fan modules
◦
Port-side intake airflow (N9K-C9300-FAN3)
◦
Port-side exhaust airflow (N9K-C9300-FAN3-B)
•
Switch accessory kit
Step 2
Check the contents of the box for damage.
Step 3
If you notice any discrepancies or damage, send the following information to your customer service representative by
email:
•
Invoice number of the shipper (see the packing slip)
•
Model and serial number of the missing or damaged unit
•
Description of the problem and how it affects the installation
Cisco Nexus 93120TX NX-OS Mode Switch Hardware Installation Guide
14
Installing the Chassis
Unpacking and Inspecting a New Switch
Содержание Nexus 93120TX
Страница 6: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide vi Contents ...
Страница 22: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 64: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 54 LEDs Power Supply LEDs ...