A P P E N D I X
D
Site Preparation and Maintenance Records
•
Site Preparation Checklist, page 55
•
Contact and Site Information, page 57
•
Chassis and Module Information, page 57
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Table 5: Site Preparation Checklist
Verification Time and Date
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Cisco Nexus 93120TX NX-OS Mode Switch Hardware Installation Guide
55
Содержание Nexus 93120TX
Страница 6: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide vi Contents ...
Страница 22: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 64: ...Cisco Nexus 93120TX NX OS Mode Switch Hardware Installation Guide 54 LEDs Power Supply LEDs ...