Verification Time and Date
Planning Activity
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the
equipment
Dedicated (separate)
circuits for power
redundancy
UPS for power failures
Grounding: proper wire
gauge and lugs
Circuit breaker size
Grounding evaluation:
Data center ground
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment
(transceivers)
EMI evaluation:
Distance limitations for
signaling
Site wiring
RFI levels
Contact and Site Information
Use the following worksheet to record contact and site information for the installation.
Contact person
Contact phone
Cisco Nexus 9236C NX-OS Mode Switch Hardware Installation Guide
60
Site Preparation and Maintenance Records
Contact and Site Information
Содержание Nexus 92160YC-X
Страница 6: ...Cisco Nexus 9236C NX OS Mode Switch Hardware Installation Guide vi Contents ...
Страница 22: ...Cisco Nexus 9236C NX OS Mode Switch Hardware Installation Guide 12 Preparing the Site Clearance Requirements ...
Страница 66: ...Cisco Nexus 9236C NX OS Mode Switch Hardware Installation Guide 56 LEDs LEDs ...