S e n d d o c u m e n t a t i o n c o m m e n t s t o n e x u s 5 k d o c s @ c i s c o . c o m .
G-1
Cisco Nexus 6000 Series Hardware Installation Guide
OL-15902-02
A P P E N D I X
G
Site Planning and Maintenance Records
This appendix provides log sheets that you can use to record information when installing a Cisco Nexus
6000 Series switch.
This appendix includes the following sections:
•
Site Preparation Checklist, page G-1
•
Contact and Site Information, page G-3
•
Chassis and Module Information, page G-4
Note
For information about how to query the switch for configuration information, see the appropriate Cisco
Nexus 6000 Series CLI configuration guide
.
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful
switch operation, ventilation, and accessibility.
Table G-1
lists the site planning tasks that we
recommend completing before installing a Cisco Nexus 6000 Series switch.
Consider heat dissipation when sizing the air-conditioning requirements for an installation. See the
environmental requirements, and the
“Power Specifications” section on page B-3
for power and heat
ratings.