Contents
iv
Cisco ME 3800X and ME 3600X and ME 3600X-24CX Switch Software Configuration Guide
OL-29335-01
Configuring Framing
2-5
Verifying Framing Configuration
2-6
Configuring Encapsulation
2-6
Verifying Encapsulation
2-7
Configuring the CRC Size for T1 Interfaces
2-7
Verifying the CRC Size
2-8
Changing a Channel Group Configuration
2-8
Saving the Configuration
2-9
Troubleshooting E1 and T1 Controllers
2-9
Setting Loopbacks
2-9
Setting a Loopback on the E1 Controller
2-10
Setting a Loopback on the T1 Controller
2-10
Run Bit Error Rate Test
2-11
Monitoring and Maintaining the T1/E1 Interface Module
2-13
Configuring CEM
2-13
Configuring a CEM Group
2-13
Using CEM Classes
2-14
Configuring CEM Parameters
2-15
Configuring Payload Size (Optional)
2-15
Setting the Dejitter Buffer Size
2-16
Shutting Down a CEM Channel
2-16
Configuration Examples
2-16
Framing and Encapsulation Configuration Example
2-16
CEM Configuration Example
2-17
C H A P T E R
3
Configuring BFD Offload
3-1
Restrictions for BFD Offload Support
3-1
Configuring BFD Offload Support
3-1
Verifying BFD Offload Support
3-2
C H A P T E R
4
Configuring Clocking and Timing
4-1
Network Clocking Overview
4-1
Precision Timing Protocol (PTP)
4-1
Transparent Clocking
4-2
Clock Synchronization
4-2
Synchronous Ethernet
4-3
Synchronous Ethernet ESMC and SSM
4-3
Configuring Clocking and Timing
4-3
Configuring PTP Clocking
4-3