Configuring Spanning Tree
Defining Spanning Tree
Cisco Small Business SFE/SGE Managed Switches Administration Guide
252
10
•
Root Port — Indicates the port number that offers the lowest cost path from
this bridge to the Root Bridge. It is significant when the Bridge is not the Root.
•
Root Path Cost — The cost of the path from this bridge to the root.
•
Topology Changes Counts — Indicates the total amount of STP state changes
that have occurred.
•
Last Topology Change — Indicates the amount of time that has elapsed since
the bridge was initialized or reset, and the last topographic change occurred.
The time is displayed in a day hour minute second format, for example, 2 days
5 hours 10 minutes and 4 seconds.
STEP 2
Define the relevant fields.
STEP 3
Click Apply. STP is enabled, and the device is updated.
Defining Spanning Tree Interface Settings
Network administrators can assign STP settings to specific interfaces in the STP
Interface Settings Page
.
To assign STP settings to an interface: