background image

 

 

 

 

 

 

 
 
 
 
 

 

 
Cisco C880 M5 Server Service Guide

 

 
November 2017

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Americas Headquarters 

Cisco Systems, Inc. 
170 West Tasman Drive 
San Jose, CA 95134-1706 USA 
http://www.cisco.com 
Tel: 408 526-4000 
800 553-NETS (6387) 
Fax: 408 527-0883 

 
 
 
 
 
 

Содержание C880 M5

Страница 1: ...sco C880 M5 Server Service Guide November 2017 Americas Headquarters Cisco Systems Inc 170 West Tasman Drive San Jose CA 95134 1706 USA http www cisco com Tel 408 526 4000 800 553 NETS 6387 Fax 408 527 0883 ...

Страница 2: ...SUPPLIERS DISCLAIM ALL WARRANTIES EXPRESSED OR IMPLIED INCLUDING WITHOUT LIMITATION THOSE OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF DEALING USAGE OR TRADE PRACTICE IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT SPECIAL CONSEQUENTIAL OR INCIDENTAL DAMAGES INCLUDING WITHOUT LIMITATION LOST PROFITS OR LOSS OR DAMAGE TO DAT...

Страница 3: ... FST 19 1 5 Request to system administrator 20 2 Installing System Board 21 2 1 Conditions for installing components 21 2 1 1 Firmware version 21 2 1 2 Maximum installation amount 21 2 1 3 Conditions concerning combined use of System Board 21 2 1 4 Base Unit state 21 2 2 Work Items Work Assignment and Work Time 22 2 3 Procedure for installing a system board 22 2 3 1 Checking the delivered items 22...

Страница 4: ...g Memory 32 4 3 1 Checking the delivered items 32 4 3 2 Installing option Existing SB 32 4 3 3 Installing option New SB 34 4 4 Verifying operation 34 4 5 Preparation of handing over to the system administrator 37 4 6 Handover to the system administrator 38 5 Installing PCI Card 39 5 1 Conditions for installing components 39 5 1 1 Firmware version 39 5 1 2 Maximum installation amount 39 5 1 3 Condi...

Страница 5: ...rive SSD 51 7 1 Conditions for installing components 51 7 1 1 Firmware version 51 7 1 2 Maximum installation amount 51 7 1 3 Conditions concerning combined use of HDD SSD 51 7 1 4 Base Unit state 51 7 2 Work Items Work Assignment and Work Time 52 7 3 Procedure for Installing HDD SSD 52 7 3 1 Checking the delivered items 52 7 3 2 Installing option System Power On 52 7 3 3 Installing option System P...

Страница 6: ... 62 9 3 2 Installing option 62 9 4 Verifying operation 63 9 5 Preparation of handing over to the system administrator 65 9 6 Handover to the system administrator 65 10 Installing I O Unit B IOUB 66 10 1 Conditions for installing components 66 10 1 1 Firmware version 66 10 1 2 Maximum installation amount 66 10 1 3 Conditions concerning combined use of IOUB 66 10 1 4 Base Unit state 66 10 2 Work Ite...

Страница 7: ...mware version 79 12 1 2 Maximum installation amount 79 12 1 3 Conditions concerning combined use of M2 Flash Device 79 12 1 4 Base Unit state 79 12 2 Work Items Work Assignment and Work Time 80 12 3 Procedure for Installing M 2 Flash Device 80 12 3 1 Checking the delivered items 80 12 3 2 Installing option 80 12 4 Verifying operation 81 12 5 Preparation of handing over to the system administrator ...

Страница 8: ... to the system administrator 93 14 6 Handover to the system administrator 93 Appendix A Installation Instructions Sheet 95 Appendix B Customer s Distribution Panel Breaker Requirements 96 Appendix C Plug Types 98 C 1 Base Unit Plug Types Global standard 98 C 2 Power Distribution Box Plug Types 98 Appendix D Input Power Systems 99 D 1 2 PSUs 99 D 2 3 PSUs 100 D 3 4 PSUs 101 Appendix E Various Opera...

Страница 9: ... BBU status confirming 118 Appendix F Handling the Units 120 F 1 Unit location 120 F 2 SB 121 F 2 1 Installing SB 121 F 2 2 Removing SB 122 F 2 3 Installing a cover of SB 122 F 2 4 Removing a cover of SB 123 F 3 IOUB 124 F 3 1 Installing IOUB 124 F 3 2 Removing IOUB 125 F 3 3 Installing IOUB cover 125 F 3 4 Removing IOUB cover 126 F 4 DU_SAS 127 F 4 1 Installing DU_SAS 127 F 4 2 Removing DU_SAS 12...

Страница 10: ...SSD 147 F 11 2 Removing HDD SSD 148 F 12 PCIe SSD SFF 149 F 12 1 Installing PCIe SSD SFF 149 F 12 2 Removing PCIe SSD SFF 150 F 13 Installing LAN card module 151 F 13 1 10G BASE LAN Card 151 F 13 2 CAN FCoE card 10Gbps 153 F 13 3 25G BASE LAN card 154 F 13 4 40G BASE LAN card 155 F 14 Installing M 2 Flash Device 156 F 15 Installing eLCM Activation License 157 F 16 FBU for Ext SAS RAID Card 158 F 1...

Страница 11: ... Prevention of Improper Cable Connections 167 Appendix I Port number of PCI card 170 I 1 LAN card 170 I 2 Fibre Channel card 171 I 3 SAS card SAS RAID controller card 172 I 4 CNA card 173 I 5 Infiniband HCA card 174 ...

Страница 12: ...g the installation procedure and installation preparations SET0101010 1 1 1 Scope This section describes the scope of the addition instructions typical time required for assembling options work assignment and notes SET0101020 1 1 2 Typical time required for assembling options The following table lists the typical time required for assembling options Table 1 1 2 Typical time required for assembling...

Страница 13: ... To extract a component from the unit extract it from the unit placed on a static dissipative mat laid out on a flat workbench before starting to work on it After removing a unit from the system board store it in an antistatic bag ANNT Notes on using an antistatic bag Make sure that the antistatic bag is not ripped or torn Confirm that no part of the unit sticks out from the antistatic bag When th...

Страница 14: ...stion ANNT Connecting cables To prevent incorrect cable connections affix a destination label to the cable and cabinet See Appendix H Prevention of Improper Cable Connections SET0102000 1 2 Preparing Tools for Installation This section covers the tools measuring instruments test program references and other items to be prepared in advance SET0102010 1 2 1 Tools and measuring instruments Table 1 2 ...

Страница 15: ...dity RH Temperature oC Humidity RH 5 to 35 without ATD 5 to 40 with ATD 20 to 80 0 to 50 8 to 80 ANNT The temperature requirements depend on the altitude of the installation location When the system is installed at an altitude of 0 to 1000 m 0 to 3 281 ft above sea level 5 to 40 oC 41 to 104 0 oF When the system is installed at an altitude of 1 000 to 1 500 m 3 281 to 4 921 ft above sea level 5 to...

Страница 16: ... The power could not be turned on because of high humidity levels in a new building The room temperature should be evenly maintained throughout the room A temperature alarm was triggered because heat was not dissipated because of the poor layout of the air conditioning for the units A sufficient amount of cool air should be provided through the floor outlets There should be sufficient clearance un...

Страница 17: ...guration of the customer distribution panels and check the power outlet shapes and power shutoff feature of the circuit breakers For the power outlet shapes see Appendix C Plug Types For connection configurations for customer distribution panels see Table 1 3 3 Table 1 3 3 Amount of PSU Refer to Input Power Systems 2 See Appendix D 1 2 PSUs 3 See Appendix D 2 3 PSUs 4 See Appendix D 3 4 PSUs ...

Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...

Страница 19: ... 1 Figure 1 4 2 Compatibility View Settings RMRK If Internet Explorer v11 cannot be used the following web browsers can be used When the following browsers are used the setting of a browser like Internet Explorer v11 is not needed Microsoft Edge Browser Google Chrome v50 and higher version Firefox v46 and higher version ...

Страница 20: ...nal connection for details 2 Confirm unit location and quantity with installing to the system administrator 3 When the BitLocker function enable request to suspend the BitLocker function 4 When the BIOS password enable request to disable the BIOS password 5 When expansion of unit cannot work possible in the state of system power on request system power off 6 When the Email Alerting function enable...

Страница 21: ... in Chapter 4 Installing Memory SET0201010 2 1 1 Firmware version No conditions SET0201020 2 1 2 Maximum installation amount 4 system boards SET0201030 2 1 3 Conditions concerning combined use of System Board The conditions for installing components described in Chapter 3 Installing CPUs must be satisfied The conditions for installing components described in Chapter 4 Installing Memory must be sat...

Страница 22: ...ns match those written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 2 3 2 Installing option SET0203020 2 3 2 Installing option In...

Страница 23: ...pendix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 2 4 1 is displayed Max 10 minut...

Страница 24: ...SEL downloading 7 Unzip the SystemEventLog zip then copy config txt file onto desktop of the operation terminal 8 Open the config txt with text editor See Table 2 4 1 for CPU See Table 2 4 2 for DIMM type A slot with Install indicates that the slot is populated and not populated ...

Страница 25: ...atinum 8164 CPU 2 00GHz Intel Xeon Platinum 8164 Processor Intel R Xeon R Platinum 8168 CPU 2 70GHz Intel Xeon Platinum 8168 Processor Intel R Xeon R Platinum 8160M CPU 2 10GHz Intel Xeon Platinum 8160M Processor Intel R Xeon R Platinum 8160 CPU 2 10GHz Intel Xeon Platinum 8160 Processor Intel R Xeon R Platinum 8153 CPU 2 00GHz Intel Xeon Platinum 8153 Processor Intel R Xeon R Platinum 8158 CPU 3 ...

Страница 26: ... administrator SET0205000 2 5 Preparation of handing over to the system administrator 1 End the Video Redirection See Appendix E 3 2 Video Redirection end 2 Logout of iRMC S5 Web See Appendix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 2 6 Handover to th...

Страница 27: ...ll of the CPU is applied Installing the memories See chapter 4 Installing Memory Install the CPU to the position CPU 0 and CPU 1 on SB without fail SET0301010 3 1 1 Firmware version No conditions SET0301020 3 1 2 Maximum installation amount 2 CPUs per a SB SET0301030 3 1 3 Conditions concerning mixing different types of CPU All CPUs must be same product name SET0301040 3 1 4 Base Unit state AC pow...

Страница 28: ...livered options match those written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The target functions can be used with the specifications and version level of units delivered separately due to delivery considerations 2 Proceed to 3 3 2 Installing option SET0303020 3 3 2 Installi...

Страница 29: ...ted DIMMs The system configuration and the setting are confirmed to the system administrator See Table 4 1 2 Table4 1 2 Memory Operation Mode Normal Mode Full Mirror Mode Address Range Mirror Mode Spare Mode 1 set per addition 2 sets per addition 2 sets per addition 1 set per addition set same 2 DIMMs SET0401030 4 1 3 Conditions on mixing different types of DIMM When mixing DIMMs with different ca...

Страница 30: ... each Memory Operation Mode represents the same type of DIMMs All DIMMs must have the same type SET0401040 4 1 4 Memory installing order Memory installing order is see Table 4 1 4 1 The system configuration and the setting are confirmed to the system administrator ...

Страница 31: ...or Intel R Xeon R Platinum 8164 CPU 2 00GHz Intel Xeon Platinum 8164 Processor Intel R Xeon R Platinum 8168 CPU 2 70GHz Intel Xeon Platinum 8168 Processor Intel R Xeon R Platinum 8160 CPU 2 10GHz Intel Xeon Platinum 8160 Processor Intel R Xeon R Platinum 8153 CPU 2 00GHz Intel Xeon Platinum 8153 Processor Intel R Xeon R Platinum 8158 CPU 3 00GHz Intel Xeon Platinum 8158 Processor Intel R Xeon R Pl...

Страница 32: ...ch those written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to the net procedure according to the following procedures When instal...

Страница 33: ...change is made the SB Alarm indicator lights temporarily However it turns off when Memory Operation Mode setting ends normally Figure 4 3 2 7 Connect the operation terminal See Appendix E 1 Operation terminal connection 8 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 9 Proceed to the next procedure according to the following procedures When changing Memory Operatio...

Страница 34: ...ystem administrator to install memories See Appendix F 8 Memory 3 Next procedure follows to chapter 2 Installing System Board SET0404000 4 4 Verifying operation Confirm the installed memory according to the following procedures 1 Start Video Redirection See Appendix E 3 1 Video Redirection start 2 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 3 Turn on the sy...

Страница 35: ...L downloading 5 Unzip the SystemEventLog zip then copy config txt file onto desktop of the operation terminal 6 Open the config txt with text editor See Table 4 4 1 for CPU type See Table 4 4 2 for DIMM type A slot with Install indicates that the slot is populated and not populated ...

Страница 36: ... Platinum 8170M Processor Intel R Xeon R Platinum 8170 CPU 2 10GHz Intel Xeon Platinum 8170 Processor Intel R Xeon R Platinum 8164 CPU 2 00GHz Intel Xeon Platinum 8164 Processor Intel R Xeon R Platinum 8168 CPU 2 70GHz Intel Xeon Platinum 8168 Processor Intel R Xeon R Platinum 8160M CPU 2 10GHz Intel Xeon Platinum 8160M Processor Intel R Xeon R Platinum 8160 CPU 2 10GHz Intel Xeon Platinum 8160 Pr...

Страница 37: ...tructions See Figure 4 4 2 10 Make sure that orange indicator of the System Alarm and CSS are not lit or blinking See Figure 4 4 3 Figure 4 4 3 11 Turn off the system power See Appendix E 5 2 Power Off 12 Proceed to 4 5 Preparation of handing over to the system administrator SET0405000 4 5 Preparation of handing over to the system administrator 1 End the Video Redirection See Appendix E 3 2 Video ...

Страница 38: ...nistrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of iRMC or BIOS has been temporarily changed for work the setting change is requested to the system administrator 3 The work is ended ...

Страница 39: ...In this chapter FBU BBU represents FBU for Ext SAS RAID Card SET0501000 5 1 Conditions for installing components When installing PCI card SB must be installed as indicated by Table 5 1 For example when installing the PCI card in slot 4 of IOU 0 it is necessary installed SB in SB 1 Table 5 1 SB installation location IOUB installation location and PCI slot number IOU 0 IOU 1 SB 0 Slot 0 1 2 3 SB 1 S...

Страница 40: ...istrator Service engineer 1 Handover to the system administrator System administrator and Service engineer 5 SET0503000 5 3 Procedure for installing a PCI card SET0503010 5 3 1 Checking the delivered items 1 Check the delivered items by confirming the following 1 The types and quantities of delivered options match those written on the order sheet 2 The delivered items match those listed in the Lis...

Страница 41: ...dix F 9 4 Removing PCI card slot 2 and slot 3 4 Mount the PCI card in PCI cassette See Appendix F 9 3 Installing PCI card slot 2 and slot 3 5 Install the PCI cassette into the IOUB Wait about 10 seconds 6 When the Base Unit state is AC Power Off turn on AC power then wait about a minute 7 Make sure that the Alarm indicator of the PCI cassette is not lit See Figure 5 3 2 Figure 5 3 2 8 Install SPF ...

Страница 42: ...nstall the PCI card into the IOUB See Appendix F 9 1 Installing PCI card other than slot 2 and slot 3 Refer to Appendix F 16 FBU for Ext SAS RAID Card When SAS RAID Card is installed in Slot 0 and FBU BBU is added 4 Install the IOUB into the Base Unit See Appendix F 3 1 Installing IOUB 5 Turn on AC power of the Base Unit Wait until green indicator of the System Power turns off 6 Make sure that the...

Страница 43: ...n start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 5 4 1 is displayed Max 10 minutes Figure 5 4 1 6 Download the SEL to the operation terminal See Appendix E 8 SEL downloading 7 Unzip the SystemEventLog zip then copy config txt file onto desktop of the operation te...

Страница 44: ...PCI card are displayed Install See Figure 5 4 2 10 Confirm the PCI card same as the system administrator instructions See Table 5 4 Meaning of value that follows ID ID wwww xxxx yyyy zzzz wwww Vender ID xxxx Device ID yyyy SubVender ID zzzz SubSystem ID Table 5 4 ...

Страница 45: ...inistrator 1 End the Video Redirection See Appendix E 3 2 Video Redirection end 2 Logout of iRMC S5 Web See Appendix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 5 6 Handover to the system administrator SET0506000 5 6 Handover to the system administrator ...

Страница 46: ...U BBU represents FBU for DU_SAS SET0601000 6 1 Conditions for installing components When installing DU_SAS at location of DU 0 installing SB at location of SB 0 is necessary When installing DU_SAS at location of DU 1 installing SB at location of SB 1 is necessary SET0601010 6 1 1 Firmware version No conditions SET0601020 6 1 2 Maximum installation amount 2 units SET0601030 6 1 3 Conditions concern...

Страница 47: ...The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 6 3 2 Installing option SET0603020 6 3 2 Installing option Install according to the following procedures ...

Страница 48: ...t the operation terminal See Appendix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure ...

Страница 49: ...d not populated Figure 6 4 2 Example 9 Confirm that installed DU_SAS is displayed as Install See Figure 6 4 2 10 Confirm RAID Controller and HDD SSD is displayed as Install See Figure 6 4 2 11 Confirm the HDD or SSD same as the system administrator instructions 12 When FBU BBU option is installed confirmation of FBU BBU status is necessary See Appendix E 10 FBU BBU status confirming 13 Make sure t...

Страница 50: ...ix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 6 6 Handover to the system administrator SET0606000 6 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of iRMC or...

Страница 51: ...7 1 Conditions for installing components SET0701010 7 1 1 Firmware version No conditions SET0701020 7 1 2 Maximum installation amount 4 devices per DU_SAS SET0701030 7 1 3 Conditions concerning combined use of HDD SSD HDD and SSD cannot exist together in same DU_SAS SET0701040 7 1 4 Base Unit state Table 7 1 4 shows whether or not to work in each state of the Base Unit 1 Confirm it to the system a...

Страница 52: ...he delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to the next procedure according to the following procedures When the Base Unit state is AC Power On System Po...

Страница 53: ...tem Power turns off 4 Proceed to 7 4 Verifying operation SET0704000 7 4 Verifying operation Confirm the HDD SSD according to the following procedures 1 Connect the operation terminal See Appendix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at ...

Страница 54: ...ith Install indicates that the slot is populated and not populated Figure 7 4 2 Example 9 Confirm that the DU_SAS installing HDD SSD is displayed as Install See Figure 7 4 2 10 Confirm that the HDD SSD are displayed as Install See Figure 7 4 2 11 Confirm the amount of installed HDD or SSD same as the system administrator instructions 12 Make sure that orange indicator of the System Alarm and CSS a...

Страница 55: ...ix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 7 6 Handover to the system administrator SET0706000 7 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of iRMC or...

Страница 56: ...1000 8 1 Conditions for installing components When installing DU_PCIE at DU 0 location installing SB at location of SB 0 is necessary When installing DU_PCIE at DU 1 location installing SB at location of SB 1 is necessary SET0801010 8 1 1 Firmware version No conditions SET0801020 8 1 2 Maximum installation amount 2 units SET0801030 8 1 3 Conditions concerning combined use of DU_PCIE No conditions ...

Страница 57: ... match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 8 3 2 Installing option SET0803020 8 3 2 Installing option Install according to the following procedures ANNT The installati...

Страница 58: ... 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 8 4 1 is displayed Max 10 minutes ...

Страница 59: ...tor A slot with Install indicates that the slot is populated and not populated Figure 8 4 2 Example 9 Confirm that installed DU_PCIE is displayed as Install See Figure 8 4 2 10 Confirm SSD SFF are displayed as Install See Figure 8 4 2 11 Confirm the amount of installed SSD SFF same as the system administrator instructions 12 Make sure that orange indicator of the System Alarm and CSS are not lit o...

Страница 60: ...ix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 8 6 Handover to the system administrator SET0806000 8 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of iRMC or...

Страница 61: ...alling components SET0901010 9 1 1 Firmware version No conditions SET0901020 9 1 2 Maximum installation amount 4 devices per a DU_PCIE SET0901030 9 1 3 Conditions concerning combined use of SSD SFF No conditions SET0901040 9 1 4 Base Unit state Table 9 1 4 shows whether or not to work in each state of the Base Unit Table 9 1 4 Base Unit state Work possible AC Power Off Yes AC Power On System Power...

Страница 62: ... delivered options match those written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 9 3 2 Installing option SET0903020 9 3 2 Inst...

Страница 63: ... 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 9 4 1 is displayed Max 10 minutes ...

Страница 64: ...t with Install indicates that the slot is populated and not populated Figure 9 4 2 Example 9 Confirm that the DU_PCIE installing SSD SFF is displayed as Install See Figure 9 4 2 10 Confirm the SSD SFF are displayed as Install See Figure 9 4 2 11 Confirm the amount of installed SSD SFF same as the system administrator instructions 12 Make sure that orange indicator of the System Alarm and CSS are n...

Страница 65: ...ix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 9 6 Handover to the system administrator SET0906000 9 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC or...

Страница 66: ...f IOUB See Table 10 1 When installing IOUB at IOU 1 location installing SB at installation of SB 2 and SB 3 is necessary for using all PCI slots of IOUB See Table 10 1 Table 10 1 Connection from SB to each IOUB System board installation location IOUB installation location IOU 0 IOU 1 SB 0 Slot 0 1 2 3 SB 1 Slot 4 5 6 7 SB 2 Slot 0 1 2 3 SB 3 Slot 4 5 6 7 SET1001010 10 1 1 Firmware version No condi...

Страница 67: ...tems match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 10 3 2 Installing option SET1003020 10 3 2 Installing option Install according to the following procedures ANNT The inst...

Страница 68: ...1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 10 4 1 is displayed Max 10 minutes ...

Страница 69: ...stall indicates that the slot is populated and not populated Figure 10 4 2 Example 9 Confirm that installed IOUB is displayed as Install See Figure 10 4 2 10 Confirm that installed all PCI card are displayed as Install See Figure 10 4 2 11 Confirm the amount of installed PCI card same as the system administrator instructions 12 Confirm that the type of PCI card installed matches the PCI card direc...

Страница 70: ... that follows ID ID wwww xxxx yyyy zzzz wwww Vender ID xxxx Device ID yyyy SubVender ID zzzz SubSystem ID Table 10 4 13 Make sure that orange indicator of the System Alarm and CSS are not lit or blinking See Figure 10 4 3 ...

Страница 71: ...dix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 10 6 Handover to the system administrator SET1006000 10 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC...

Страница 72: ...nts SET1101010 11 1 1 Firmware version No conditions SET1101020 11 1 2 Maximum installation amount 4 units Minimum amount is 2 PSUs SET1101030 11 1 3 Conditions concerning mixing different types of PSU No conditions SET1101040 11 1 4 Base Unit state Table 11 1 4 shows whether or not to work in each state of the Base Unit Table 11 1 4 Base Unit state Work possible AC Power Off Yes AC Power On Syste...

Страница 73: ...elivered items by confirming the following 1 The types and quantities of delivered options match those written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The target functions can be used with the specifications and version level of units delivered separately due to delivery co...

Страница 74: ...erifying operation System Power Off When Base Unit state is AC Power On System Power Off Turn on AC power to the installed PSU then wait for about 5 minutes And proceed to 11 5 2 Verifying operation System Power Off When Base Unit state is AC Power On System Power On Turn on AC power to the installed PSU then wait for about 5 minutes And proceed to 11 5 1 Verifying operation System Power On SET110...

Страница 75: ...dures 1 Click on System tab and click on Power and click on Power Supplies The window shown in Figure 11 5 1 appears Figure 11 5 1 2 Confirm that installed PSU is no problem See Figure 11 5 1 3 Download the SEL to the operation terminal See Appendix E 8 SEL downloading 4 Proceed to 11 6 Preparation of handing over to the system administrator ...

Страница 76: ...cedures 1 Start Video Redirection See Appendix E 3 1 Video Redirection start 2 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 3 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 11 5 1 is displayed Max 10 minutes Figure 11 5 2 1 ...

Страница 77: ...appears Figure 11 5 2 2 5 Confirm that installed PSU is no problem See Figure 11 5 2 2 6 Make sure orange indicator of the System Alarm and CSS are not lit or blinking See Figure 11 5 2 3 Figure 11 5 2 3 7 Download the SEL to the operation terminal See Appendix E 8 SEL downloading 8 Turn off the system power ...

Страница 78: ...ove the LAN cable connected for work 3 Reinstall all the covers and doors that were removed during the work 4 Clean them with a cleaning agent and waste cloth 5 Proceed to 11 7 Handover to the system administrator SET1107000 11 7 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC or BIOS has been temp...

Страница 79: ...ng components Can be installed on BMM Board installed in SB 0 The order of installation is from M 2 0 SET1201010 12 1 1 Firmware version No conditions SET1201020 12 1 2 Maximum installation amount 2 units SET1201030 12 1 3 Conditions concerning combined use of M2 Flash Device No conditions SET1201040 12 1 4 Base Unit state AC power to the Base Unit is off ...

Страница 80: ...ed items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 12 3 2 Installing option SET1203020 12 3 2 Installing option Install according to the following procedures ANNT The ...

Страница 81: ...ndix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 12 4 1 is displayed Max 10 minute...

Страница 82: ...inal 8 Open the config txt with text editor A slot with Install indicates that the slot is populated and not populated Figure 12 4 2 Example 9 Confirm that the BMM is displayed as Install See Figure12 4 2 10 Confirm that the M 2 Flash Device is displayed as Install See Figure12 4 2 11 Make sure that orange indicator of the System Alarm and CSS are not lit or blinking See Figure 12 4 3 ...

Страница 83: ...dix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 12 6 Handover to the system administrator SET1206000 12 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC...

Страница 84: ...t the scope of the expansion work This chapter shows the installation procedure of Micro SD SET1301000 13 1 Conditions for installing components Can be installed on BMM Board installed in SB 0 SET1301010 13 1 1 Firmware version No conditions SET1301020 13 1 2 Maximum installation amount 1 unit SET1301030 13 1 3 Conditions concerning combined use of Micro SD No conditions SET1301040 13 1 4 Base Uni...

Страница 85: ...n on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 13 3 2 Installing option SET1303020 13 3 2 Installing option Install according to ...

Страница 86: ...t the operation terminal See Appendix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure ...

Страница 87: ...n terminal 8 Open the config txt with text editor A slot with Install indicates that the slot is populated and not populated Figure 13 4 2 Example 9 Confirm that the BMM is displayed as Install See Figure 13 4 2 10 Confirm the Micro SD is displayed as Install See Figure 13 4 2 11 Make sure that orange indicator of the System Alarm and CSS are not lit or blinking See Figure 13 4 3 ...

Страница 88: ...dix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 13 6 Handover to the system administrator SET1306000 13 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC...

Страница 89: ...s for installing components Can be installed on BMM Board installed in SB 0 SET1401010 14 1 1 Firmware version No conditions SET1401020 14 1 2 Maximum installation amount 1 unit SET1401030 14 1 3 Conditions concerning combined use of TPM No conditions SET1401040 14 1 4 Base Unit state AC power to the Base Unit is off ...

Страница 90: ...se written on the order sheet 2 The delivered items match those listed in the List of Accessories 3 All cabinets are free of any abnormalities such as scratches dents or dirt 4 The specifications and version level of units delivered separately due to delivery considerations are available for the target functions 2 Proceed to 14 3 2 Installing option SET1403020 14 3 2 Installing option Install acco...

Страница 91: ...he operation terminal See Appendix E 1 Operation terminal connection 2 Log in to the iRMC S5 Web from the operation terminal See Appendix E 2 1 Login 3 Start Video Redirection See Appendix E 3 1 Video Redirection start 4 Set BIOS Setup at Boot Device Selector See Appendix E 4 Boot Device Selector setting 5 Turn on the system power See Appendix E 5 1 Power On Wait for a few minutes until Figure 14 ...

Страница 92: ...n terminal 8 Open the config txt with text editor A slot with Install indicates that the slot is populated and not populated Figure 14 4 2 Example 9 Confirm that the BMM is displayed as Install See Figure 14 4 2 10 Confirm the TPM is displayed as Install See Figure 14 4 2 11 Make sure that orange indicator of the System Alarm and CSS are not lit or blinking See Figure 14 4 3 ...

Страница 93: ...dix E 2 2 Logout 3 Remove the LAN cable connected for work 4 Reinstall all the covers and doors that were removed during the work 5 Clean them with a cleaning agent and waste cloth 6 Proceed to 14 6 Handover to the system administrator SET1406000 14 6 Handover to the system administrator 1 Close the doors of the rack and hand over the door key to the system administrator 2 When the setting of IRMC...

Страница 94: ...94 Appendix ...

Страница 95: ...nstallation Instructions Sheet Use the sheet shown in the following figure to provide the installation worker with instructions on the required settings for on site installation Figure A 1 Installation instructions sheet example ...

Страница 96: ...se a breaker that meets these requirements in the customer s distribution panel Table B 1 Distribution panel breaker capacity Power input Device name Capacity of breaker in customer s distribution panel for use in countries other than European countries Capacity of breaker in customer s distribution panel for use in Europe 200 to 240 VAC Power distribution box 30A 32A 200 to 240 VAC Main Device 20...

Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...

Страница 98: ...with the device or cable supplied with the optional component Do not use the power cable supplied with the device to connect a different product Figure C 1 Base Unit plug type APP0302000 C 2 Power Distribution Box Plug Types ANNT To connect to the Outlet distribution box use the power cables which were packaged with the device or with options parts Those cables should not be used for other product...

Страница 99: ...power source system of the Base Unit In this chapter PSU represents a power supply unit APP0401000 D 1 2 PSUs Connect power cables according to the Figure D 1 1 or Figure D 1 2 See Appendix B Customer s Distribution Panel Breaker Requirements Figure D 1 1 Figure D 1 2 ...

Страница 100: ...100 APP0402000 D 2 3 PSUs Connect power cables according to the Figure D 2 1 or Figure D 2 2 See Appendix B Customer s Distribution Panel Breaker Requirements Figure D 2 1 Figure D 2 2 ...

Страница 101: ...bles according to the Figure D 3 1 or Figure D 3 2 When 1 AC Source connect power cables according to the Figure D 3 3 or Figure D 3 4 See Appendix B Customer s Distribution Panel Breaker Requirements Figure D 3 1 When 2 AC Sources Figure D 3 2 When 2 AC Sources ...

Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...

Страница 103: ... to the Base Unit by LAN cable 1 Set IP Address Subnet Mask and Gateway Address for the maintenance terminal exclusive use to the FST 2 Connect form the FST LAN port to the management LAN port of the Base Unit by LAN cable APP0501020 E 1 2 When connect the FST to network switch by LAN cable DHCP disabled 1 Permission to connect FST with the switch on network is obtained 2 Set IP Address Subnet Mas...

Страница 104: ...sion using PC of customer equipment is obtained APP0502000 E 2 iRMC Web APP0502010 E 2 1 Login 1 Enter the URL at the web browser 2 Press the ENTER key The window shown in Figure E 2 1 1 appears Figure E 2 1 1 6 Enter service engineer account 7 Click on Login button The window shown in Figure E 2 1 2 appears ...

Страница 105: ...105 Figure E 2 1 2 ...

Страница 106: ...106 APP0502020 E 2 2 Logout 1 Click on pull down menu of login user name and click on Logout See Figure E 2 2 Figure E 2 2 ...

Страница 107: ...d Video Redirection AVR The window shown in Figure E 3 1 1 appears Figure E 3 1 1 2 Click on HTML5 Viewer check box and enable it See Figure E 3 1 1 3 Click on the Apply button 4 Click on Video Redirection icon on the upper right of the view and click on Start Video Redirection See Figure E 3 1 1 The window shown in Figure E 3 1 2 appears ...

Страница 108: ...108 Figure E 3 1 2 ...

Страница 109: ...Settings tab click on Service and click on Advanced Video Redirection AVR The window shown in Figure E 3 2 1 appears Figure E 3 2 1 2 Click on HTML5 Viewer check box and disable it 3 Click on the Apply button The Video Redirection connection HTML5 will end ...

Страница 110: ... Click on Settings tab click on System and click on Boot Options The window shown in Figure E 4 appears Figure E 4 2 Select BIOS Setup at Boot Device selector pull down menu See Figure E 4 3 Click on the Apply button 4 Confirm that BIOS Setup was set ...

Страница 111: ... Options The window shown in Figure E 5 1 1 appears Figure E 5 1 1 2 Confirm that BIOS Setup was set See Figure E 5 1 1 3 Click on Power icon on the upper right of the view and click on Power On See Figure E 5 1 1 Wait for a few minutes until Figure E 5 1 2 is displayed on the Video Redirection screen Max 10 minutes ...

Страница 112: ...112 Figure E 5 1 2 ...

Страница 113: ...he window shown in Figure E 5 2 appears Figure E 5 2 2 Click on Power icon on the upper right of the view and click on Press Power Button See Figure E 5 2 Wait about 30 seconds after click on Tools tab then click on System tab again 3 Confirm that the Power Status display became Power Off ...

Страница 114: ...s tab click on Server Management and click on Memory Operation Mode The window shown in Figure E 6 appears Figure E 6 2 Set Memory Operation Mode according to instructions of the system administrator 3 Click on the Apply button 4 Confirm that instructions value was set ...

Страница 115: ... 3 Open the config txt with text editor See Figure E 7 See Table E 7 for DIMM type Figure E 7 Example Table E 7 Display of Installed DIMM DIMM Type DIMM capacity GB RANK DPRD 0008014 RDIMM 8 1 DPRD 0016014 RDIMM 16 1 DPRD 0016024 RDIMM 16 2 DPRD 0032024 RDIMM 32 2 DSRD 0064044 RDIMM 64 4 DPLR 0064044 LRDIMM 64 4 DSRD 0128084 RDIMM 128 8 4 Check installed DIMM information on all SBs ...

Страница 116: ...ols tab click on Reports and click on System Event Log The window shown in Figure E 8 1 appears Figure E 8 1 2 Click on Save button and save SystemEventLog file to the operation terminal See Figure E 8 1 3 Rename SystemEventLog to SystemEventLog zip ...

Страница 117: ...ings tab click on Power Management and click on Power Restore Policy The window shown in Figure E 9 appears Figure E 9 2 Select the corresponding setting value at Power Restore Policy pull down menu 3 Click the Apply button 4 Confirm the corresponding value was set ...

Страница 118: ...on System tab click on Mass Storage and click on RAID Controllers The window shown in Figure E 10 1 appears Figure E 10 1 2 Click on mark with RAID Controller See Figure E 10 1 3 Confirm Status display under Battery Backup Unit is Normal See Figure E 10 2 ...

Страница 119: ...119 Figure E 10 2 ...

Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...

Страница 121: ...010 F 2 1 Installing SB 1 Insert a SB into the Base Unit 2 Move the left and right the B parts of the SB in the direction of the arrow See Figure F 2 1 1 3 Lock the B parts with the A parts See F 2 1 2 Figure F 2 1 1 Figure F 2 1 2 ...

Страница 122: ... and unlock the B parts See Figure F 2 2 2 Move the left and right the B parts of the SB in the direction of the arrow 3 Pull a SB out of the Base Unit Figure F 2 2 APP0602030 F 2 3 Installing a cover of SB 1 Slide a cover in the direction of the arrow See Figure F 2 3 Figure F 2 3 ...

Страница 123: ...123 APP0602040 F 2 4 Removing a cover of SB 1 Slide a cover in the direction of the arrow while pressing part A See Figure F 2 4 Figure F 2 4 ...

Страница 124: ...IOUB APP0603010 F 3 1 Installing IOUB 1 Insert IOUB into the Base Unit 2 Move the B part in the direction of the arrow See Figure F 3 1 1 3 Lock the B part with the A part See Figure F 3 1 2 Figure F 3 1 1 Figure F 3 1 2 ...

Страница 125: ...k the B part See Figure F 3 2 2 Move the B part in the direction of the arrow 3 Pull IOUB out of the Base Unit Figure F 3 2 APP0603030 F 3 3 Installing IOUB cover 1 Slide the cover in the direction of the arrow and fix with the screws See Figure F 3 3 Figure F 3 3 ...

Страница 126: ...126 APP0603040 F 3 4 Removing IOUB cover 1 Remove the screws and slide the cover in the direction of the arrow See Figure F 3 4 Figure F 3 4 ...

Страница 127: ...ase Unit 2 Move the B part in the direction of the arrow See Figure F 4 1 Figure F 4 1 APP0604020 F 4 2 Removing DU_SAS 1 While moving the A part in the direction of the arrow move the B part in the direction of the arrow See Figure 6 4 2 Figure F 4 2 2 Pull a DU_SAS out of the Base Unit ...

Страница 128: ...e Base Unit 2 Move the B part in the direction of the arrow See Figure F 5 1 Figure F 5 1 APP0605020 F 5 2 Removing DU_PCIE 1 While moving the A part in the direction of the arrow move the B part in the direction of the arrow See Figure F 5 2 Figure F 5 2 2 Pull DU_PCIE out of the Base Unit ...

Страница 129: ...part to install See Figure F 6 1 2 Connect the power cable and fix the power cable using the C part Figure F 6 1 APP0606020 F 6 2 Removing PSU 1 Turn off the AC power and disconnect the power cable 2 Hold down the A part and pull the B part See Figure F 6 2 3 Pull PSU out of the Base Unit Figure F 6 2 ...

Страница 130: ...PU Figure F 7 Location of CPUs APP0607010 F 7 1 Installing CPU 1 The key and the keyway red circle part are matched and Processor Clip is installed in CPU package See Figure F 7 1 1 Do not touch on back PAD of CPU package ...

Страница 131: ...131 Figure F 7 1 1 2 Fast pin position red circle part is matched and install the CPU package to the heat sink See Figure F 7 1 2 ...

Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...

Страница 133: ...133 Figure F 7 1 3 4 The size of guide pin is noted red circle part and blue round part Mount the CPU package installed the heat sink on SB See Figure F 7 1 4 ...

Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...

Страница 135: ...135 Figure F 7 1 5 ...

Страница 136: ...e A part See Figure F 8 1 1 Since the cover of the A part is not fixed it can be easily detached 2 Open the B part at both ends of the memory slot See Figure F 8 1 2 3 Mount the DIMM in the memory slot 4 Press down the DIMM and lock with the B part See Figure F 8 1 3 5 Attach the cover of the A part Figure F 8 1 1 ...

Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...

Страница 138: ...the cover of the A part See Figure F 8 2 1 Since the cover of the A part is not fixed it can be easily detached 2 Open the B part at both ends of the memory slot and eject the DIMM See Figure F 8 2 2 3 Remove the DIMM Figure F 8 2 1 Figure F 8 2 2 ...

Страница 139: ... PCI card AS for slot 2 and slot 3 PHP is possible APP0609010 F 9 1 Installing PCI card Other than slot 2 and slot 3 1 Remove the PCI card dummy See Figure F 9 1 2 Install the PCI card and fix with the screw Figure F 9 1 ...

Страница 140: ...140 APP0609020 F 9 2 Removing PCI card Other than slot 2 and slot 3 1 Remove the screw and remove the PCI card See Figure F 9 2 Figure F 9 2 ...

Страница 141: ...Figure F 9 3 1 2 Pull the B part then remove the PCI cassette out of a IOUB See Figure F 9 3 2 3 Remove the screw and PCI card dummy 4 Install the PCI card and fix with the screw See Figure F 9 3 3 5 Insert the PCI cassette into the IOUB and lock it by moving up the A part See Figure F 9 3 4 Figure F 9 3 1 Figure F 9 3 2 ...

Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...

Страница 143: ... APP0610000 F 10 FBU for DU_SAS APP0610010 F 10 1 Installing a FBU 1 At a slight angle fit the FBU under both retaining brackets of the FBU holder as shown in Figure F 10 1 1 Push in the FBU until it locks in place See Figure F 10 1 1 Figure F 10 1 1 2 Connect the FBU cable See Figure F 10 1 2 Figure F 10 1 2 3 Secure the FBU See Figure F 10 1 3 ...

Страница 144: ...144 Figure F 10 1 3 ...

Страница 145: ...145 APP0610020 F 10 2 Installing a TFM module 1 Install a TFM module to the SAS array controller card or Dual SAS array controller card See Figure F 10 2 1 and Figure F 10 2 2 Figure F 10 1 1 ...

Страница 146: ...e F 10 1 2 APP0610030 F 10 3 Connecting FBU cable 1 Connect between the FBU and the TFM module with the FBU cable See Figure F 10 3 1 The FBU cable are the attached items of the flash backup unit Figure F 10 3 1 ...

Страница 147: ...APP0611010 F 11 1 Installing HDD SSD 1 Insert HDD SSD into the HDD SSD slot 2 Move the B part in the direction of the arrow See Figure F 11 1 1 3 Lock the B part with the A part See Figure F 11 1 2 Figure F 11 1 1 Figure F 11 1 2 ...

Страница 148: ...0611020 F 11 2 Removing HDD SSD 1 Push the A part and unlock the B part See Figure F 11 2 1 2 Move the B part in the direction of the arrow See Figure F 11 2 2 3 Remove HDD SSD Figure F 11 2 1 Figure F 11 2 2 ...

Страница 149: ...12010 F 12 1 Installing PCIe SSD SFF 1 Insert PCIe SSD SFF into the PCIe SSD SFF slot 2 Move the B part in the direction of the arrow See Figure F 12 1 1 3 Lock the B part with the A part See Figure F 12 1 2 Figure F 12 1 1 Figure F 12 1 2 ...

Страница 150: ...20 F 12 2 Removing PCIe SSD SFF 1 Push the A part and unlock the B part See Figure F 12 2 1 2 Move the B part in the direction of the arrow See Figure F 12 2 2 3 Remove PCIe SSD SFF Figure F 12 2 1 Figure F 12 2 2 ...

Страница 151: ... PLAN EP OCe14102 2x 10Gb LP MC 0JXEN1 MC 0JCEK1 When order number of 10G BASE LAN card is MC 0JXEK1 install the module shown in Figure F 13 1 1 Any module shown in Figure F 13 1 1 can be installed When order number of 10G BASE LAN card is MC 0JXEA1 install the module shown in Figure F 13 1 1 Any module shown in Figure F 13 1 1 can be installed When order number of 10G BASE LAN card is MC 0JXEN1 i...

Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...

Страница 153: ...0Gbps Table F 13 2 Product Name order number Module order number PCNA EP OCe14102 2x 10Gb LP MC 0JCEL1 MC 0JCEK1 When order number of CNA card 10Gbps is MC 0JCEL1 install the module shown in Figure F 13 2 1 Figure F 13 2 1 Module MC 0JCEK1 ...

Страница 154: ...d Table F 13 3 Product Name order number Module order number PLAN EP MCX4 LX 25Gb 2p SFP28 LP MC 0JFE11 MC 0JFE21 When order number of 25G BASE LAN card is MC 0JFE11 install the module shown in Figure F 13 3 1 Figure 13 3 1 Module MC 0JFE21 ...

Страница 155: ...er number Module order number PLAN EP MCX4 EN 40Gb 2p QSFP LP MC 0JFE41 MC 0JFE51 MC 0JFE61 When order number of 40G BASE LAN card is MC 0JFE41 install the module shown in Figure F 13 4 1 and Figure F13 4 2 Figure F 13 4 1Module MC 0JFE51 Figure F 13 4 2 Module MC 0JFE61 ...

Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...

Страница 157: ...157 APP0615000 F 15 Installing eLCM Activation License The installation of Micro SD which is a component of eLCM Activation License will be explained See Figure F 15 Figure F 15 ...

Страница 158: ... 16 FBU for Ext SAS RAID Card APP0616010 F 16 1 Installing a TFM module 1 Install a TFM module to the SAS array controller card or Dual SAS array controller card See Figure F 16 1 1 and Figure F 16 1 2 Figure F 16 1 1 ...

Страница 159: ... 2 APP0616020 F 16 2 Connecting the FBU cable to RAID Card 1 Connect between the FBU and the TFM module with the FBU cable See Figure F 16 2 1 The FBU cable is an attached items of the flash backup unit Figure F 16 2 1 ...

Страница 160: ...160 APP0616030 F 16 3 Connecting FBU cable to connector on IOUB 1 Connect the FBU cable to connector on IOUB See Figure F 16 3 Figure F 16 3 ...

Страница 161: ...6040 F 16 4 Mounting FBU to OPUB 1 Push up A then pull out the OPUB to front with B See Figure F 16 4 1 Figure F 16 4 1 2 Push in the FBU to FBU holder until it locks in place See Figure F 16 4 2 Figure F 16 4 2 ...

Страница 162: ...162 3 Mount the FBU to the OPUB See Figure F 16 4 3 Figure F 16 4 3 4 Lock the FBU holder with B and connect the cable like A See Figure F 16 4 4 Figure F 16 4 4 5 Insert the OPUB ...

Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...

Страница 164: ...164 APP0700000 Appendix G Cable Connection Diagram This appendix describes the cables connected to the Base Unit APP0701000 G 1 Cable Connection Diagram See Figure G 1 1 and Figure G 1 2 Figure G 1 1 ...

Страница 165: ...165 Figure G 1 2 ...

Страница 166: ...e an enough space where the maintenance of the unit is possible for cable routing See Figure G 2 To ensure sufficient clearance for inserting and removing the units leave some extra cable length when routing the cables so that they do not overlap the units which must be visible from the front The AC cable must be fixed to reusable cable tie of PSU firmly Figure G 2 Cable routing recommendation ...

Страница 167: ...ed for each cable Figure I 1 Cable label with tie 2 Work procedure 1 For each unit write down a unit identifier on a label and affix the label near the file system connector port on the unit Also write down the unit identifier on the installation drawing cable connection diagram Unit label Size 50 x 15 mm If the label is too large cut it to the appropriate size Xy X Unit symbol See the table below...

Страница 168: ...of the connection destination of the connector at this end of the cable Use the physical location name referring to the unit concerned CCC Destination of the connector at the other end of the cable same format as above Example of written labels indicating a connection between port 2 of the PT board in slot 4 of the main unit first from the left and channel 12 of the hub third from the left 3 Attac...

Страница 169: ...169 Figure I 4 Attaching cable destination labels with ties 4 Connect the connectors at cable ends to the destination ports indicated on the first lines of their labels ...

Страница 170: ...170 APP0900000 Appendix I Port number of PCI card Port number of PCI card that has two or more ports APP0901000 I 1 LAN card Figure I 1 ...

Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...

Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...

Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...

Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...

Отзывы: