2-9
Cisco ONS 15530 Hardware Installation Guide
OL-7706-01
Chapter 2 Installing the Cisco ONS 15530
Rack-Mounting the Shelf
Figure 2-6
Attaching Shelf to Equipment Rack
Step 4
Check that all release levers are in the closed position, the chassis mounting screws are tight, and all
CPU switch module and line card captive screws are tight.
Step 5
Proceed to the
“Attaching the Air Ramp Baffle” section on page 2-10
.
15530-FCGE-8P
FASTENERS MUST BE
FULLY ENGA
GED PRIOR
TO
OPERATING
THE POWER SUPP
LY
FAIL
A
H
GOOD
STATUS
15530-C-000
0
1
3
5
8
STATUS
15530-C-000
0
1
3
5
8
STATUS
15530-C-000
0
1
3
5
8
STATUS
15530-C-000
0
1
3
5
8
STATUS
STATUS
RESET
ATIE
OMPAT
FLASH
IRTIAL
MAOR
FD
MBPS
UTOFF
HIST
LR
15530-CP
RESET
ATIE
OMPAT
FLASH
IRTIAL
MAOR
FD
MBPS
LIN
LIN
AU
ON
ON
UTOFF
HIST
LR
UTOFF
MINOR
15530-CP
AU
ON
STATUS
E
E
STATUS
E
E
STATUS
0
1
3
5
STATUS
E
E
FAN
STATUS