7-71
Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
OL-11496-01
Chapter 7 Maintaining the Router
Removing and Installing a Chassis
Step 8
Connect the supplemental bonding and grounding connection (if there is one) to
the chassis (see
Supplemental Bonding and Grounding Connections, page 3-28
Step 9
Connect the power cords to the PDUs on the rear of the chassis.
•
Removing and Replacing an AC PDU, page 7-36
•
For 2400 W DC PDUs, see
of
Removing and Replacing a DC PDU,
•
For 2800 W DC PDUs, see
of
Removing and Replacing a DC PDU,
Step 10
Power on the circuit breakers to the power supplies.
Step 11
Power on the router.
Chapter 5, “Troubleshooting the Installation”
if the router does not power
on correctly.
Packing a Defective Chassis for Shipment
Use the packaging that came with the replacement chassis to repack and ship the
defective chassis.
Содержание 12010 series
Страница 6: ......
Страница 363: ...B 3 Cisco 12010 Cisco 12410 and Cisco 12810 Router Installation and Configuration Guide OL 11496 01 Appendix B Site Log ...
Страница 364: ...Appendix B Site Log B 4 Cisco 12010 Cisco 12410 and Cisco 12810 Router Installation and Configuration Guide OL 11496 01 ...