Chapter 2 Preparing for Installation
Site Requirement Guidelines
2-6
Cisco 12010, Cisco 12410, and Cisco 12810 Router Installation and Configuration Guide
OL-11496-01
Site Requirement Guidelines
The following sections contain the site requirement guidelines that you should be
familiar with before installing the router:
•
Rack-Mounting Guidelines, page 2-6
•
Air Flow Guidelines, page 2-13
•
Temperature and Humidity Guidelines, page 2-14
•
Power Connection Guidelines, page 2-14
•
NEBS Supplemental Unit Bonding and Grounding Guidelines, page 2-19
•
Site Wiring Guidelines, page 2-21
Rack-Mounting Guidelines
The router can be mounted in most 2-post, 4-post, or telco-type 19-inch
equipment racks that comply with the Electronics Industries Association (EIA)
standard for equipment racks (EIA-310-D). The rack must have at least two posts
with mounting flanges to mount the router chassis. The distance between the
center lines of the mounting holes on the two mounting posts must be 18.31 inches
± 0.06 inch (46.50 cm ± 0.15 cm). The rack-mounting hardware included with the
router is suitable for most 19-inch equipment racks or telco-style frames.
shows examples of typical 2-post, 4-post, and telco-type equipment
racks.
Содержание 12010 series
Страница 6: ......
Страница 363: ...B 3 Cisco 12010 Cisco 12410 and Cisco 12810 Router Installation and Configuration Guide OL 11496 01 Appendix B Site Log ...
Страница 364: ...Appendix B Site Log B 4 Cisco 12010 Cisco 12410 and Cisco 12810 Router Installation and Configuration Guide OL 11496 01 ...