3.2.- INSTALLATION
The unit is installed on a panel. The thickness should not exceed 6 mm. Drill panel at 92
+0.6
x
45
+0.6
mm.
Terminals, opening roofs or removing elements can expose parts that are haz-
ardous to the touch while the unit is powered. Do not use the unit until it is fully
installed.
All the connections are located inside the electric panel. The unit must be installed on the panel
from the front. Attach the unit with the 4 panel assembly accessories (
figure 1
)
Cable cross-section for connections up to: 2.5 mm
2
.
The unit must be connected to a power circuit protected by a circuit breaker switch or equiva-
lent device located close to unit, marked accordingly, and easily accessed by the operator.
figure 1: Unit installation and attachment
8
DHB-302 DHB-324
Instruction Manual
Содержание DHB-302
Страница 1: ...INSTRUCTION MANUAL M044B01 03 17A Single phase Vac analyzer DHB 302 DHB 324...
Страница 2: ...2 DHB 302 DHB 324 Instruction Manual...
Страница 64: ...Figure 60 Dimensions of the DHB 3xx 64 DHB 302 DHB 324 Instruction Manual...
Страница 66: ...8 CE CERTIFICATE 66 DHB 302 DHB 324 Instruction Manual...
Страница 69: ...69 Instruction Manual DHB 302 DHB 324...