ENGLISH
3.
Installing and mounting
BPHE mounting position must ensure sufficient space
around the unit to be able to carry out maintenance works
and service. Installation position must allow the possibility
of venting and drainage.
Upon mounting the BPHE in the installation, the most
suitable orientation is vertical (up-right). All other positions
may cause loss in heat transfer efficiency or mechanical
problems.
For two-phase operation, BPHE must always be installed
in a vertical position (evaporator, condenser).
Never install a BPHE with the connectors facing down.
Use mounting brackets for BPHE fixation or support them
on their basis. It is not recommended to support the heat
exchangers just on the piping (e.g. on connectors or close
pipework).
Installing a heat exchanger, the maximum forces and
torques must not be exceeded.
During the mounting of the heat exchanger maximal loads on the fastening bolts must
not be exceeded.
Weld stud
Area of tension
mm
2
Extension strength
Ft (N)
Torque
Mt (Nm)
M8x20
36.6
1060
16
M10x25
58
2250
32
M12x25
84.3
3270
56
The diameter
of connection
Displacement
Fs (kN)
Tension
Ft (kN)
Bending
moment
Mb (Nm)
Torque
Mt (Nm)
1/2" (DN15)
3.5
2.5
20
35
3/4" (DN20)
12
2.5
20
115
G 1” (DN25)
11.2
4
45
155
1 1/4" (DN32)
14.5
6.5
87.5
265
1 1/2" (DN40)
16.5
9.5
155
350
2” (DN50)
21.5
13.5
255
600
2 1/2” (DN65)
44.5
18
390
1000
Primary
channel
Secondary
channel