13
ENGLISH
14. The insulation mounting instructions
The mounting of heat insulation has to be performed after completing of the soldering
and welding works and when the equipment has cooled.
Before installation of the insulation package, make sure that the appropriate size is
chosen and it complies with the surface of the BPHE.
As the insulation used is sectional, its mounting can be performed on already installed
and functioning heat exchangers.
15. Warranty
The warranty considers defects of material and the product, which occurred during the
manufacturing process. The warranty is not covering defects and damage that were created
during the mounting and operation (including corrosion and freezing of the heat exchanger).
The basics of operational properties of our BPHE are the correct mounting, service and
operation conditions, which are described in the provided manual. We do not bear
responsibility for losses, occurred due to noncompliance to these conditions.
Attention:
The mounting and servicing of the BPHE has to be provided in compliance with the
present manual. In case this condition is not fulfilled we do not bear responsibility for the
operation of the BPHE.
For additional information contact the manufacturer or his representatives.
Содержание BRAZED PLATE HEAT EXCHANGERS
Страница 13: ...ENGLISENGL 12 ENGLISH 13 Connection scheme ...
Страница 26: ...ITALIANO 12 ITALIANO 13 Schema di collegamento ...
Страница 28: ...14 Notes ...