Cino eC Pro Скачать руководство пользователя страница 36

MAN1010119 rel. 01 dated 30.01.2014   

 

                         page no. 36 of  52 page 

 

www.rheavendors.com     tel: 0039 02 966 551     fax: 0039 02 96 55 086     e mail: [email protected] 

rheavendors group's sole property 

 

 

 

 

09.01.s. product audit 

flux 

 

 

 

 

09.01.t.  machine id. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

09.01.u. variflex 

 

 

 

 

 

 

 

 

 

 

09.02. “data” 

  

  

  

09.03. “test vend” 

  

  

09.04. “clean” 

   

 

 

09.05. “maintenance” 

 

 

 

09.06. data support 

 

 

 

for every soluble canister can be set the delivered grams’ quantity 

by second (key “4” and “5”); 

 

 

display the partial and the total quantity of delivered product; the 

partial  audit  can  be  erased  by  pressing  the  key  “4”  for  some 

seconds; 

 

 

 

identification codes for data acquisition in EVA DTS: 

 

-  machine number; 

 

-  location number; 

 

-  machine configuration; 

 

-  address for the connection with the DDCMP protocol; 

 

 

-  0 for the audit via telemetry; 1 to enable the IRDA acquisition; 2 

  to disable the acquisition; 

 

 

to set the diameter of the coffee brewer installed in the machine; 

 

 

it  decides  whether  to  keep  the  percolation  chamber  of  the  coffee 

brewer  inserted  in  the  upper  piston  or  not  in  the  standby  phase 

(close); 

 

to enable the grinder calibration time; 

 

 

 

choose the option “data” to enable the display to show the data of 

the dispensing cycles you have performed in succession, just as in 

09.01.h.;  

 

to dispense selections on a free basis; the selections made in this 

mode are counted separately (see 09.01.h.);  

 

choose  this  option  and  press  “1=pb”,  “2=mx1”,  “4=water”  or 

“8=hc.”  to  enable  the  vending  machine  to  dispense  a  pre-fixed 

water quantity to wash the corresponding circuit (see 08.03.); 

 

to  carry  out  the  same  functions  as  those  described  by  point 

09.01.o.; 

 

 

the  values  of  the  variables  composing  the  machine  programming 

(configuration)  can  be  transferred  to  an  external  support,  i.e.  the 

flash key; to transfer the machine parameters to the key: 

  

-  power off the machine; 

-  open the door; 

-  insert  the  flash  key  into  the  orange  carter  slot  (see  

  05.15. and 05.37.c); 

-  power on the machine with the service key (see 05.13.); 

-  the display shows: 

 

-  press “2”; 

-  and wait for the display to show:    

  

-  power off the machine and remove the flash key; 

  

now,  the  flash  key  contains  all  the  parameters  typical  of  the 

machine  from  which  they  have  been  fetched.  If  you  wish  to 

programme another vending machine with these data, the previous 

procedure can be repeated by pressing key “1” instead of “2”: the 

information  will  be  transferred  from  the  flash  key  to  the  vending 

machine;  both  procedures  will  not  alter  the  data  contained  in  the 

supports from which they have been fetched; 

 

 

 

 

 

 

 

 

 code ID 101 

                      00 
 code ID 104 

                      00 
 code ID 106 

                      00 
 address VIDTS 

                      00 

Data Audit 0=TLMS 

1=IRDA  2=off   00 

 calibr.  motor   N 

 gr/sec 

 product    N   used 

 Parz. g.            00 

 product    N   used 

 Tot. g.             00 

BREWER DIAMETER 

0=36  1=45        00  

POSIT. STAND BY 

0=close 1=open  00 

Autom. Adjustment 

f. Tuning  1=yes   0 

TEST VEND 

                       

CLEANING 

 butt: 1=pb   2=mx1 

  4=water     8=hc. 

 1 from key to VMC 

 2 from VMC to key 

END PROGRAMMING 

   wait ……… 

cino eC PRO  by 

Содержание eC Pro

Страница 1: ...NSTALLATION AND MAINTENANCE MANUAL Translation of the original instructions MAN1010119 rel 01 dated 30 01 2014 cino eC PRO type compact ___________________________________ www rheavendors com espresso...

Страница 2: ...erly carried out the actions marked by this symbol may expose to accidental contacts with moving members the same symbols are placed inside the vending machine to indicate the parts on which to act wi...

Страница 3: ...pply to skilled technicians the machine shall be installed according to national rules pay special attention to the rules about the machines directly connected with the hydraulic network room during s...

Страница 4: ...event any potential effect on the environment and human health strictly follow the provisions of the European Parliament s 2002 96 EC Directive MAN1010119 rel 01 dated 30 01 2014 page no 4 of 52 page...

Страница 5: ...sation product powder bags never repair or carry out any technical action if you have not been properly trained signal that a technical action is in progress on the machine barriers against approach s...

Страница 6: ...carelessness non observance of the instructions for the operation of the machine incorrect installation or maintenance by unauthorised personnel transport damage or any circumstance anyway not due to...

Страница 7: ...directives and safety standards Directives 2004 108 EC 2006 42 EC 97 23 EC 2011 65 EC RoHS 2002 96 EC RAEE Regulations 1907 2006 EC REACH 1935 2004 EC Standards SAFETY EN 60335 1 2012 EN 60335 2 75 20...

Страница 8: ...02 966 551 fax 0039 02 96 55 086 e mail rheavendors rheavendors com ATTENTION this label applied next to the serial number label inside the vending machine points out that the instructions supplied b...

Страница 9: ...dors Industries S p A s prior authorisation in writing the utilisation reproduction or disclosure of the technical information in this document can be protected by Rheavendors Industries S p A accordi...

Страница 10: ...mm x 3 C A weighted sound pressure level ten selection buttons two sixteen character lines graphic three colors open folding cup support useful height 85 mm drip tray beneath the cup surface a fixed d...

Страница 11: ...by means of a flash key see 09 06 the water and energy supply tolerance limits that can ensure a good and proper operation of the cino eC PRO machine are water total hardness recommended conductivity...

Страница 12: ...lement the vending machines of the cino eC PRO range Rheavendors Industries S p A has got a series of accessories manufactured for these machines such as cabinets autonomous water supply kits anti lim...

Страница 13: ...01 2014 page no 13 of 52 page www rheavendors com tel 0039 02 966 551 fax 0039 02 96 55 086 e mail rheavendors rheavendors com rheavendors group s sole property cino eC PRO by 05 23 product slide and...

Страница 14: ...m rheavendors group s sole property cino eC PRO by 05 19 heater coffee brewer 05 21 grinder 05 06 level sensors 05 25 product motor 05 28 mixer motor 05 29 powder extraction drawer housing 05 06 waste...

Страница 15: ...as got a fixed drink dispenser on the cup support surface the door is closed by means of a lock the key is mapped and numbered for identification it collects possible residual drops from the dispenser...

Страница 16: ...quantity is determined by a software parameter see 09 01 a grinder time that establishes the grinder work time it collects over thirty ground doses after having used them in the coffee brewer a softw...

Страница 17: ...any condensate it accumulates water for sending to the pressure boiler the level is controlled by a float and if above the established level it will flow back to the inlet solenoid valve safety device...

Страница 18: ...the water quantity of instant selections is established by the time set in the water N parameter see 09 01 a solenoid valve name sw outlet E1 water 1 mixing bowl 1 E2 water 2 hot water 2 EX coffee wa...

Страница 19: ...boards and supplies the lighting leds of the cup compartment the RFID card is a hardware option that can equip the machine it is housed inside the cover it enables the operator to programme the produc...

Страница 20: ...the flash key used for these software handlings must have been previously initialised with RheAction for example in general the transfer procedure is power off the machine insert the flash key into t...

Страница 21: ...s the vending machine shall be arranged for work in a sheltered room by using a support suitable for the weight of the machine see 03 02 its distance from the walls shall provide for good air circulat...

Страница 22: ...ress http eur lex europa eu directive 98 83 EC of 03 11 1998 observe the rules on connections with the electric network in particular on grounding connect the machine permanently without using any red...

Страница 23: ...brewer will be handled act extremely carefully at the end of assembly and final testing the water used for testing is discharged from the machine at the first power on at the station all circuits mus...

Страница 24: ...anitary wash cycle for the brewer and then the wash cycles for the mixing bowls and the direct water circuit see 09 04 repeat the operation for some times to rinse the whole water circuit of the machi...

Страница 25: ...to the machine configuration see 04 and to the canister labels fill in the coffee hopper with coffee beans close the canisters and the coffee hopper with their upper covers rotate the baffles of the...

Страница 26: ...G to go back to the usual operation of the vending machine and to store all changes you have made the display will show press the key PROG press 1 the buttons of the selection keyboard will assume the...

Страница 27: ...N the key you have pressed before the real selection will fulfil the function of the items listed in the preselection paragraph scroll by pressing key 4 and 5 use key 2 to scroll the following items c...

Страница 28: ...he mixer will not rotate you can carry out a time test on the set point see 13 18 if the rotation time is other than zero the mixer fan will be rotated at the expiry of this delay time the mixer rotat...

Страница 29: ...les are listed here below message appearing on the display during the dispensing cycle decaffeinated product canister keys 4 and 5 mixing bowl and mixing water keys 4 and 5 price change with respect t...

Страница 30: ...after the latest espresso to activate the following parameter to establish the power on time of the pressure boiler heating element to increase the water temperature to determine the temperature at wh...

Страница 31: ...s remove the tube close the pressure boiler tap and reinsert the drain plug of the air break when the display shows at the end of the uninstall cycle the pressure boiler water temperatures will be set...

Страница 32: ...aded on RFID cards DA 402 total amount loaded on RFID cards after the reset DA 201 total amount sold by means of a RFID card DA 203 total amount sold by means of a RFID card after the reset DA 202 qua...

Страница 33: ...cify the value in the ensemble of coins tubes this chapter is intended to determine current time current day current month current year day of the week use the three pairs of parameters Start FN and E...

Страница 34: ...lace the cartridge of the external filter if any as soon as 500 dispensing cycles are left the display will show change water filter and as soon as the decounter has reached 0 it will display out of s...

Страница 35: ...0 grams if this is true press the key 1 if not set the amount weighed by pressing the keys 4 and 5 to change the digits on the display in the lower right corner at the end press the key 1 remember to...

Страница 36: ...h choose this option and press 1 pb 2 mx1 4 water or 8 hc to enable the vending machine to dispense a pre fixed water quantity to wash the corresponding circuit see 08 03 to carry out the same functio...

Страница 37: ...l sel coins price n coin n heater temperature definition first coffee enable display temp language decimal number partial tests voltage part selections total selections total money part money summer t...

Страница 38: ...n tuning grinder n product flux calibration brewer calibr motor gr sec audit flux prod N used part g hour day year switching off month clock day of week start fn end fn maintenance water filter cnt pr...

Страница 39: ...ters milk P1 chocolate P2 01 espresso water exp 35 02 long coffee water exp 45 03 white coffee water exp 45 prod 2 8 delay prod 2 7 water 1 20 mixer 1 40 delay mixer 1 3 04 cappuccino water exp 65 pro...

Страница 40: ...k 1st delay 2nd milk 2nd delay time 10 02 LM selection cino eC PRO can produce a drink called Latte Macchiato composed by milk and coffee and served in the cup in differently coloured bands typically...

Страница 41: ...0 no delay mixer speed low medium high temperature pressure boiler C 0 105 first coffee temperature C 0 105 first coffee time min 0 20 heater temperature min 0 40 product decounter sec 0 6 000 0 no li...

Страница 42: ...mblies and functions in question in the following table the first column shows the machine number any variant is shown with the detail letters for more specification the second shows the machine distr...

Страница 43: ...ugh or some obstacle might slow down the regular water flow filter grilled cover load pipes either choked or clogged the water inlet solenoid valve safety has tripped the pressure boiler circuit has b...

Страница 44: ...tity the error is more likely to occur the programming keyboard inside the machine has a short circuited key or it has been pressed too long if pressed too long the manual release button of cups turre...

Страница 45: ...ith human health and the supply of foodstuffs reassemble all the parts you have cleaned after having dried them by means of a clean piece of cloth refer to the content of the Internet address http ec...

Страница 46: ...m from the canisters and wash them with plenty of lukewarm water product slides are plug in secured turn the fixing levers of mixing bowls clockwise d remove the product nozzles from the holder by rel...

Страница 47: ...rm water as it is described by chapter 12 01 weekly at the back of the product canister turn the black ring nut clockwise and remove it extract the worm screw by pulling the black bush to facilitate d...

Страница 48: ...hird way of the espresso valve drain by removing any trace of residue v empty and clean the air break tank z carefully check the micro switch functionality operated by the floater rod and make sure th...

Страница 49: ...rature is generally set to 92 C 94 C in a vending machine installed in a room where the temperature is as prescribed 5 C 35 C the grinding degree of the coffee beans fundamentally established by the d...

Страница 50: ...l the mixing bowl body and extract the mixer fan you can now access the w ring of the motor shaft the water inlet gaskets of the mixing bowl and the mixing bowl gaskets as already described by chapter...

Страница 51: ...for the programmed time attention make sure that the power supply cable has been detached from the mains before unscrew the six screws intended to fasten the metal panel lift slightly and extract the...

Страница 52: ...valve 2 symbol BP CA RS EX E1 E2 column 4 5 4 5 5 5 name water inlet solenoid valve water inlet valve water internal tank air break volumetric counter pump ex 5 non return valve symbol EVA VIA SA AB...

Страница 53: ......

Отзывы: