
M-97RG2 Hardware Installation Manual
12
Pin
Color
Signal
Pin
Color
Signal
3
Green/White
Rx +
7
Brown/White
BI-
4
Blue
BI-
8
Brown
BI-
5.
Verify the Installation and Services
5.1.
Verify the Installation
Check LED states to verify Gateway status (Section 5.2).
Services are not available until the Gateway is ranged and provisioned in the network. If services must
be verified at the time of installation, refer to Section for additional instructions.
5.2.
Activating the Gateway
Once the Gateway installation is complete, follow the procedure below for verifying Gateway status.
Figures below shows the typical status LED display after the Gateway boot sequence is complete.
Gateway
has not yet been provisioned:
Figure 2
MoCa2.5
has already been provisioned:
Figure3
Verify that the PWR LED lights green indicating that local power level is good.