
M-97RG2 Hardware Installation Manual
10
3. Hardware Operation
3.1.
Environmental Requirements
The Gateway will operate in temperatures ranging from 0° C to 40° C, relatively humidity ranging from
5% to 95%.
3.2.
Power Requirements
The Gateway will be shipped with a universal power adaptor. However, before installation, check if the
AC power input matches the specification printed on the power adaptor (input voltage, current, etc.)
CAUTION:
Please use the power adaptor within the package only, or the replacement unit that provided by
CIG. Other power adaptor may cause damage to the Gateway and other disasters.
3.3.
Mountings the Gateway
The device supports two installation methods: Installed on the wall and installed on the desktop.
Installing the Gateway on the Wall:
1. Locate a safe and accessible site for installation.
2. Align the Gateway mounting bracket on the wall. There are two mounting directions, either
horizontal or vertical. Make sure the install arrows is up when correctly mounted.
3. Mount the bracket into a wall stud by driving the two sheet metal screws into the wall through the
bracket mounting holes.
4. Plug in the cables connector to connect the Gateway to the network.
Installing the Gateway on Desktop:
1. Locate a safe and accessible site for installation.
2. Place the Gateway unit on the desk.
3. Plug in the cables connector to connect the Gateway to the network.