![Ciena 170-3916-900 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/ciena/170-3916-900/170-3916-900_hardware-installation-and-start-up-manual_2606953036.webp)
2-20
Installation
3916 Service Delivery Switch
Hardware Installation and Start-up Manual
009-3226-001 Standard Revision E
Copyright
©
2013-2015 Ciena
®
Corporation
July 2015
3
Orient the left bracket so that the face of the bracket is flush with the front of
the chassis and the upper hole is an upside-down “T” (see
).
4
Using a Phillips screwdriver, attach the bracket to the left side of the chassis
using 2 of the provided screws.
You have installed the mounting brackets on the 3916. You are now
ready to proceed with Mounting the Chassis. Use one of the following
procedures:
–
“Mounting the Chassis and Installing Supplemental Ground in a
Frame Installation” on page 2-22
–
“Mounting the Chassis (Supplemental Ground not required) in a
Frame Installation” on page 2-24
Содержание 170-3916-900
Страница 87: ......