
8
Relocation/Installation Precautions
17
1
2
3
4
5
This is to be performed with the power plug inserted.
Remove the front lower panel by first pushing the cover down and then pulling it forward.
Turn on the drainage switch, and open the drainage valve,
located at the bottom of the panel, to remove water remaining
in the system.
(When the drainage switch turned on, water purification and ice
production stops, and “ICE FULL”, “WATER FULL”, “HOT/ECONO” LED
flickers with a BEEP sound.)
Remove cold water by pressing the water dispense button.
In order to remove the water remaining in the cold water tank,
tilt the product forward and do so until cold water does not
come out.
Take out the ice by pressing the ICE(ice dispense) touch sensor button.
If there is no other option but to transport the product in an inclined position, transport the product
in a backwards inclined position if at all possible.)
In case the product is needed to be transported, please make sure there is no water left at all
inside of the unit before moving the product.
(If the product is moved without the complete drainage process as described below, it may cause
serious damage to the product.)
Содержание Super Iguassu ICE 900
Страница 9: ...9 Exploded Diagram 3 3 detailed exploded diagram 1...
Страница 10: ...10 3 4 detailed exploded diagram 2 Exploded Diagrram...
Страница 11: ...11 Exploded Diagram 3 5 detailed exploded diagram 3...
Страница 55: ...55...