
6.c
Commissioning, Stove and Installation Details
Commissioning checklist
(Initials)
Have all parts been fitted in accordance with the
instructions?
01
Has fire cement and mortar dried out before lighting
the stove?
02
Once under fire have all seals been checked for
soundness?
03
Is the flue functioning correctly so that all combustion
products are vented safely to the atmosphere via the
chimney terminal?
04
Have operating instructions, tool and gloves been left
with the customer?
05
Has the customer been advised about the correct use
of the stove ?
06
Has the customer been warned to only used the
correct fuel for this stove?
07
Stove and installation details
Shop Name
Purchase Date
Installers
Name
Installation
Date
Installers
HETAS No.
Or Building
Control Ref.
Base Heat
Shield
Yes
No
SERIAL NO.
(Your local stockist will need this to register your stove)
Direct Air
Kit Fitted
Yes
No
Is Direct Air
Commissioning
Test Completed
Sign
Page 60 of 60