background image

6

    

Figure 7

AB20034_G11

I

I

G

E

                                                                             

STEP 7

Fill all empty holes to prevent finger entrapment of 

the child. There are a total of eight (8) empty holes 

at the two (2) extra adjustment levels for Spring (N). 

Use Allen Head Bolts (G) and Connector Nuts (I) 

to fill each hole. Install as shown and thread them 

together securely using Allen Wrenches (A).

There is also one (1) empty hole in Foot Post Left 

(Q) and Foot Post Right (R) near the middle of each 

post. That hole is for mounting of Guard Rail which 

can be purchased when the Crib is converted to a 

Toddler Bed. Use an Allen Head Bolt (E) and 

Connector Nut (I) to fill each of these holes as 

shown. Thread them together securely using Allen 

Wrenches (A).

Before installing Mattress, see mattress size 

requirements under “CAUTION” statement on 

page 9. Also review all Warnings and Maintenance, 

Cleaning and Storage on pages 9 and 10.

See Figure 7.

Содержание Wadsworth 31301

Страница 1: ...5033 Monday through Friday 9 00 a m 4 00 p m Eastern Time Please have the model number and manufacture date available when you call or write us at Foundations 5216 Portside Dr Medina Oh 44256 KEEP INS...

Страница 2: ...00316 22300990 2 8 8 4 14 2 20 16 26 1 1 1 1 1 1 1 1 1 1 2 2 PREPARATION Carefully remove and lay out all hardware and parts Check quantities and match the parts list Construct Crib on an even flat fl...

Страница 3: ...t P Tighten all bolts securely See Figure 1 STEP 2 Figure 2 AB20034_G6 Note the decorative veinlines in this rail and the intermediate rail above H G I B K Install Dowel Pins into receiving holes in u...

Страница 4: ...ost Right P Follow the same procedure to attach Headboard Assembly L to the opposite end of the Stationary Side Assembly from Step 1 at Stationary Post Left O Tighten all bolts securely See Figure 3 A...

Страница 5: ...er of Spring attach the mounting arms on Spring N to the end rails on Headboard Assembly L and Footboard Assembly M Allen Head Bolts G will be installed through the hole in the mounting arm and then i...

Страница 6: ...There is also one 1 empty hole in Foot Post Left Q and Foot Post Right R near the middle of each post That hole is for mounting of Guard Rail which can be purchased when the Crib is converted to a Tod...

Страница 7: ...ely using Allen Wrenches A See Figure 8 Review WARNINGS for Toddler Bed WARNING INFANTS HAVE DIED IN TODDLER BEDS FROM ENTRAPMENT Openings in and between bed parts can entrap head and neck of a small...

Страница 8: ...ector Nuts I which are at the location where the Guard Rail is to be assembled will not be installed as explained in the earlier section The addition of the Guard Rail Extenders T included with this C...

Страница 9: ...fine furniture STORAGE When storing crib use Caution as extreme temperature or humidity changes could be harmful Use caution when a vaporizer is in use Always aim vapor stream away from crib as well...

Страница 10: ...s or other fasteners missing parts or sharp edges before and after assembly and frequently during use Securely tighten bolts and other fasteners DO NOT use the crib if any parts are missing damaged or...

Отзывы: