13.
Remove the screws from the front floor panel upper support
(1).
14.
Remove the screws from the lower frame rail extensions
(1).
Note:
The adhesive material will release from the structure by applying heat to approximately 200°C (400°F). A noticeable popping sound can normally
be heard when the adhesive releases.
15.
Locate and remove all factory welds from the front floor panel
(1). The front floor panel is bonded to the frame.
16.
Pry the downward while applying heat to the outboard edge of the panel to separate.