CDC-2000 Operational Manual
1.
CDC-2000 COMPUTER PANEL OVERVIEW-------------------------------------------------1
1.1.C
OMPUTER PANEL DESCRIPTION
-
------------------------------------------------------------------------1
1.2. M
ENITOR QPERATIONAL KEYS
-
--------------------------------------------------------------------------2
1.3. N
UMBER OPERATIONAL KEYS
-----------------------------------------------------------------------------4
1.4. C
OMBINED OPERATIONAL KEYS
--------------------------------------------------------------------------6
1.5. P
OWER OPERATIONAL KEYS
-------------------------------------------------------------------------------6
1.6. M
OTON OPERATIONAL KEYS
-------------------------------------------------------------------------------7
1.7. C
HART OPERATIONAL KEYS
-------------------------------------------------------------------------------7
1.8.
FORMING STATUS OPERATIONAL KEYS
------------------------------------------------------------------12
2. COMPUTER
CHART OVERVIEW-------------------------------------------------------------------13
2.1. S
YSTEM INITIAL CHART
-----------------------------------------------------------------------------------13
2.2.
MANUAL OPERATION SETTINTG
--------------------------------------------------------------------------14
2.3.
A
UTO PERATION SETTING
---------------------------------------------------------------------------------15
2.4. M
ONITOR TIME CHART
------------------------------------------------------------------------------------17
2.5. S
ET UP FOR BOOSTER CYLINDER MOLD CLOSING AND OPENING
-----------------------------------19
2.6. S
ETUP FOR HIGH PRESSURE CYLINDER AND SPLIT NUTS
--------------------------------------------32
2.7.
EJECTOR SETUP
--------------------------------------------------------------------------------------------38
2.8.
SORE PULL SETUP
------------------------------------------------------------------------------------------41
2.9.
UNSCREW SETUP
-------------------------------------------------------------------------------------------44
2.10.
AIR
-
BLOW SETUP
---------------------------------------------------------------------------------------48
2.11.
MOLD THICKNESS AND CLAMPING FORCE SETUP
---------------------------------------------------49
2.12.
LUBRICATION SETUP
-------------------------------------------------------------------------------------57
2.13.
INJECTION SETUP
----------------------------------------------------------------------------------------58
2.14.
PLASTICIZING AND FEEDING SETUP
------------------------------------------------------------------62
2.15.
INJECTION CARRIAGE SETUP
--------------------------------------------------------------------------65
2.16.
SPEED AND PRESSURE CURVE
--------------------------------------------------------------------------66
2.17.
THEORETICAL INJECTION VOLUME CURVE
----------------------------------------------------------67
2.18.
THEORETICAL INJECTION SPEED CURVE
-------------------------------------------------------------68
2.19.
THEORETICAL INJECTION PRESSURE CURVE
--------------------------------------------------------69
2.20.
PROMPT SETTING CHART
-------------------------------------------------------------------------------70
2.21.
TEMPERATURE SETUP
-----------------------------------------------------------------------------------73
2.22.
TEMPERATURE SETTING CHART
-----------------------------------------------------------------------75
2.23. T
EMPERATURE TIMING SETUP
-------------------------------------------------------------------------76
2.24.
TEMPERATURE CURVE OF
T1---------------------------------------------------------------------------77
2.25.
TEMPERATURE CURVE OF
T2---------------------------------------------------------------------------78
I