Wiring the F10, 1 Meter System
The procedure for wiring the F10, 1 meter system is consistent with the 2 meter procedure with
two (2) important differences. First, preparing the junction box; second, wiring the matching board.
Instead of three (3) of the knockouts being removed, only two (2) are removed (see below)
Antenna wiring is different; only one (1) coax cable is utilized, however, both connectors
(left and right) on the Impedance Matching Board are used (see Table 4.2 for F10 system).
Varied Procedure Steps
1.
Identify the “top” of the Junction Box (with the Carlon® logo facing up) and position the box
as shown. Instead of removing both sides, remove ONLY one (1) knockout from the Junction
Box (side closer to antenna) and the bottom knockout. Use a hammer and a large screwdriver.
Note: You may remove the left or right, but ONLY one (1) side knockout is removed.
2.
Only one (1) small piece of conduit needs to be cut.
3.
Perform Steps 2 – 10, but skip Step 8 and unnecessary actions (related to the second antenna).
4.
Prepare one (1) coax cable for the 1 meter system. Wire the coax cable leads to Pins 1 and 2
(left side) on the top connector.
5.
Connect the antenna wires according to Table 4.2 below.
Side
Pin Number
Antenna Wiring
Antenna 1
(Left)
J2-1
Green
J2-2
N/A
J2-3
Yellow
J2-4
N/A
Antenna 1
(Right)
J3-1
Black
J3-2
N/A
J3-3
Red
J3-4
N/A
Table 4.2
F10 Antenna Wire Pinout
Содержание Evolve F10
Страница 1: ...Evolve F10 Installation Manual Document Version 60 P N 10034505 ...
Страница 63: ...F10 Installation Manual Rev 60 63 of 71 ...
Страница 69: ...F10 Installation Manual Rev 60 69 of 71 F10 2 Meter Detection Patterns Flat Carry Front Carry Side Carry ...
Страница 71: ...F10 Installation Manual Rev 60 71 of 71 Front Carry Side Carry ...