Finishing Installation
Wiring the electronics, and configuring and tuning the antennas must occur before finishing the
physical installation. Proceed to Chapters 4, 5 and 6, complete the setup and validation, and then
return to this section when ready to finish the physical installation.
Filling Trenches
The floor cuts or cavities are filled with concrete mortar, grout, and/or sealants during this final
step, ensuring the antenna locations are not visible. It is crucial that the grout be non-metallic and
non-magnetic. Occasionally (F10 system below wooden flooring), the antenna system is not
covered by Checkpoint personnel, as it will later be covered with flooring. Protect, as necessary.
The F10 system has been tested and is approved to be used with the following concrete repair
mortars and mixes:
1.
Ardex TRM – Transportation Repair Mortar
2.
QUIKRETE® Concrete Mix (No. 1101)
3.
QUIKRETE® Fast-Setting Concrete Mix (No. 1004)
Note:
Detection performance of the system may be temporarily affected by the water content in the repair
mortar. As the mortar mix cures, detection performance improves.
Содержание Evolve F10
Страница 1: ...Evolve F10 Installation Manual Document Version 60 P N 10034505 ...
Страница 63: ...F10 Installation Manual Rev 60 63 of 71 ...
Страница 69: ...F10 Installation Manual Rev 60 69 of 71 F10 2 Meter Detection Patterns Flat Carry Front Carry Side Carry ...
Страница 71: ...F10 Installation Manual Rev 60 71 of 71 Front Carry Side Carry ...