![Check Point 61000 Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/check-point/61000/61000_getting-started-manual_2594915042.webp)
Step 3: Installing Hardware Components and Connecting Power Cables
Check Point 61000 Security System Getting Started Guide R75.40VS for 61000 | 42
Inserting Chassis Management Modules
To insert a Chassis Management Module:
1.
On the CMM, remove the tape on the battery.
This tape protects the battery life before installation.
2.
Open the upper latch.
3.
Insert the Chassis Management Module into the allocated slot.
Note
- If you have only one CMM, we recommend inserting it into the lower Chassis slot.
4.
Close the latch.
5.
Tighten the two thumb screws.
6.
After power up, all LEDs must light up for 1-2 seconds. The ACT and PWR LEDs continue to
show green after the other LEDs turn off.