Locate this face hard
against inner front
boiler face, giving 25mm
gap at rear, & 40mm at
front sides.
2
3
4
5
Combustion Chamber Insulation Board
Order of Assembly
1
Assembly Order:
1. Base (Fibre Wool)
2. Back
3. RH Side
4. LH Side
5. Top
Fig 11. Combustion Chamber Components
Fig 10. Baffle Arrangement
Top Baffle
Nibs at front
45° Chamfer
45° Chamfer
45° Chamfer
Note!
Numbers etched on to baffles must be
in correct orientation when assembled.
the inner front of the boiler. There should be a gap at
the back of approx. 25 mm, and equal gaps at the
sides. The bottom baffle (No. 1) is now carefully
lowered into position, so that the guides on its
underside hold the insulation panels in place. When
assembled the No 1 should be clearly visible, the right
way up. The remaining baffles (Nos. 2-4 ) are
assembled in order, with the numbers facing the front
of the stove as shown in Fig 10. The access door is now
re-fitted. Ensure that the rubber seal is pushed fully
home to the frame, and that the 4 brass nuts are
tightened evenly.
Once all water, oil and electrical connections have been
made and tested the installation can be finished. Fit
glass fibre insulation material around the boiler and flue
in the builders opening. This will both help prevent heat
loss and reduce noise transmission. Fit the fire
surround.
FINISHING THE INSTALLATION
WARNING
Once the installation is complete ensure that the air
control is set at maximum (No. 10) before the
burner is fired (see Fig. 8.) Otherwise sooting may
occur. This will be re-adjusted during commissioning.
Page 11
OLX V5.2 05.04
Содержание OLX
Страница 2: ......
Страница 7: ...Page 7 OLX V5 2 05 04 ...
Страница 16: ...Charnwood OLX Electrode Settings All dimensions are in mm 9 0 1 0 3 0 0 2 0 5 0 5 Page 16 OLX V5 2 05 04 ...
Страница 19: ......