Bleed Screw
Bleed Hose
Connection Point
Oil Pressure Adjustment screw.
Clockwise to Increase,
Anti-Clockwise to Decrease.
Fig. 9. Oil Pump Details
wire the controls to the burner so that it is switched off
at the same time as the pump or motorised valves.
This usually means wiring the supply to the burner into
the output from the central heating programmer.
Unpack the stove and remove it from its wooden
pallet.. If a flue liner is to be used then this should be
fitted in the chimney before fitting the fire. The liner
will normally come down to a fixing plate and a short
length of 316 Stainless steel flue pipe is then used to
connect the boiler to the liner. Alternatively the liner
may be fitted directly to the boiler, in this case ensure
that the liner is adequately supported and that it will
not vibrate when the appliance is in use. Use the Flue
Fixing brackets and self tapping screws supplied to fix
the flue securely to the boiler (see Fig. 12.) Mineral
fibre or fibreglass should be used to reduce vibrations
and insulate the boiler and flue. The space between the
flexible liner and the chimney should be filled with
loose vermiculite infill retained by a suitable plate in the
chimney above the boiler to allow future access to the
boiler without removing the infill (see Fig. 6). A
suitable rain cap should be fitted to the top of the
chimney.
Position the fire so that the rear face of the side flanges
comes flush or very slightly in front of the face of the
fire surround.
Make the flue connection to the appliance, ensuring
that the flue pipe is well sealed to the boiler, and fixed
securely using the fixing screws and brackets, see Fig.
10.
Connect the heating system to the boiler ensuring that
the system vents correctly. Fill the system with water
and check for leaks.
The boiler comes pre-wired with two lengths of 3-core
cable. The black cable is for the oil burner, the white is
for the flame effect and optional fan heater. Connect
the black cable to the output from the central heating
programmer, ensuring that the supply is via a 3 amp
fused switched spur. Connect the white cable to a
separate 3 amp fused switched spur. If a fan heater is
fitted, this fuse must be 10 amp. Ensure that the earth
connections are made.
The boiler comes with the internal insulation bricks and
FITTING THE FIRE
ELECTRICAL CONNECTION
COMBUSTION CHAMBER ASSEMBLY
baffles fitted, and it is recommended that these be
checked for position before initial firing. If it becomes
necessary to re-fit the baffles and bricks, follow this
procedure:-
Isolate from the mains supply, open the doors and lift
up and remove the bottom plate. See Fig 2. Lift off the
fence and the coal effect. Loosen the fixing screw at
each side of the inner plate , slide outwards into the
slot, and lift off the inner bottom plate. Lift the Perspex
panel out of the fire and undo the two wing nuts on the
back panel. Unplug the mains cable from the bottom of
the flame effect. The flame effect may then be lifted
clear. The boiler access door is now visible, and is
removed by undoing the 4 brass nuts with a 10 mm
socket.
Take the items 1-5 in order and lower them into
position in the bottom of the combustion chamber.
Assemble them together in this position so that both
side boards are tight in against the top & back boards,
and the front face of the top board is hard up against
Page 10
OLX V5.2 05.04
Fig. 8. Oil Burner Assembly
Shown Removed from Boiler.
Oil Pump
Ignition Unit
(Behind Control Unit)
Air Inlet
Manifold
Oil Pressure
Gauge Port
Burner
Control
Unit
Reset Button
Nozzle Cover Plate
Air Pressure Switch
Air Control 1-10
Fuel Solenoid valve
Air Control 1-10
Photocell
Содержание OLX
Страница 2: ......
Страница 7: ...Page 7 OLX V5 2 05 04 ...
Страница 16: ...Charnwood OLX Electrode Settings All dimensions are in mm 9 0 1 0 3 0 0 2 0 5 0 5 Page 16 OLX V5 2 05 04 ...
Страница 19: ......