INSTALLATION (CONT’D)
INCOMING POWER – SEE FIGURE 2
NOTICE
Upstream protection fusible disconnect or circuit breaker must be provided by installer.
“LOCK OUT” OR “TAG OUT” ALL SOURCES OF POWER.
1. Connect wire for one incoming power line to L1.
2. Connect wire for one incoming power line to L2.
3. Connect wire for one incoming power line to L3.
FIGURE 2 – COMPRESSOR POWER CONNECTIONS
Содержание CADRSASP12
Страница 10: ...9 FIGURE 1 DUPLEX CONTROL PANEL WIRING DIAGRAM ...
Страница 12: ...11 INSTALLATION CONT D CIRCUIT BREAKERS 1 Factory wired No wiring required Figure 3 Circuit Breaker ...
Страница 13: ...12 INSTALLATION CONT D MOTOR CONTACTORS 1 Factory wired No wiring required FIGURE 4 MOTOR CONTACTORS ...
Страница 15: ...14 INSTALLATION CONT D LOW OIL LEVEL MONITOR 1 Factory wired No wiring required FIGURE 6 LOW OIL LEVEL MONITOR ...
Страница 16: ...15 INSTALLATION CONT D ELECTRIC TANK DRAIN 1 Factory wired No wiring required FIGURE 7 ELECTRIC TANK DRAIN ...
Страница 25: ...24 PARTS ILLUSTRATION MODEL CADRSASP12 307CAD810 A Ref Drawing ...
Страница 27: ...26 DUPLEX CONTROL PANEL MOUNTING 305CAD810 A Ref Drawing ...
Страница 39: ...38 UNIT HAZARD DECALS ...
Страница 40: ...39 PUMP HAZARD DECALS F ...