)NSTALLATION
!TTACH THE 2AIL TO THE (EADER "RACKET
!LIGN THE RAIL WITH THE HEADER BRACKET )NSERT THE CLEVIS PIN THROUGH THE HOLES IN
THE HEADER BRACKET AND RAIL 3ECURE WITH THE RING FASTENER
./4% 5SE THE PACKING MATERIAL AS A PROTECTIVE BASE FOR THE GARAGE DOOR OPENER
HARDWARE
Clevis Pin 5/16" x 2-3/4"
Ring Fastener
Ring
Fastener
Clevis Pin
5/16
" X 2-3/4"
0OSITION THE 'ARAGE $OOR /PENER
4O PREVENT DAMAGE TO GARAGE DOOR REST GARAGE DOOR OPENER RAIL ON X PLACED ON TOP
SECTION OF DOOR
2EMOVE THE PACKING MATERIAL AND LIFT THE GARAGE DOOR OPENER ONTO A LADDER
&ULLY OPEN THE DOOR AND PLACE A X LAID FLAT UNDER THE RAIL
! X IS IDEAL FOR SETTING THE DISTANCE BETWEEN THE RAIL AND THE DOOR )F THE LADDER IS NOT
TALL ENOUGH YOU WILL NEED HELP AT THIS POINT )F THE DOOR HITS THE TROLLEY WHEN IT IS RAISED
PULL THE TROLLEY RELEASE ARM DOWN TO DISCONNECT THE INNER AND OUTER TROLLEY 3LIDE THE OUTER
TROLLEY TOWARD THE GARAGE DOOR OPENER 4HE TROLLEY CAN REMAIN DISCONNECTED UNTIL
INSTRUCTED
Connected
Disconnected