Model CL12
Installation, Operation and Maintenance
Page
10
Rev. 10/23/19
CL12-IOM-A.doc
Fig. 19-Bolt Adjustment
A
DAPTER
R
ACK
I
NSTALLATION
44) Locate the two pre-drilled holes on the back of
each column 19” up from the top of the base
plate and tap 5/16-18. Center the adapter rack
and attach with 5/16-18NC Phillips Pan Head
Screws supplied,
Fig. 20
.
Fig 20-Adapter Rack Installation
S
AFETY
D
ECAL
P
LACEMENT
45) Clean surface of the rear column above the
power unit and install Safety Decals,
Page 3
and
Fig. 21
.
Fig. 21-Safety Decal Placement
E
LECTRICAL
See Figure 23 for the following steps.
46) Wire-tie Limit Switch cord to power unit hose.
47) Connect the Overhead Limit Switch Cord to
Power Unit as shown in
Fig. 23
.
48) Connect Power Unit to suitable electrical source
as shown in
Fig. 23
.
IMPORTANT
:
A
FTER WIRING HAS BEEN
COMPLETED
,
TEST OPERATION OF
P
OWER
U
NIT
&
O
VERHEAD
L
IMIT SWITCH
.
W
HILE RAISING LIFT
,
OPERATE
O
VERHEAD
S
HUTOFF
B
AR
.
P
OWER
U
NIT
M
OTOR SHOULD STOP WHEN
S
HUTOFF
B
AR IS
RAISED
.