Model CL12
Installation, Operation and Maintenance
Page
9
Rev. 10/23/19
CL12-IOM-A.doc
L
OCK
R
ELEASE
31)
On the power column, attach lock cable
assembly to mounting tab using (2) hex jam
nuts. Bottom of stud end should stick out
approx. 3/8” from bottom hex jam nut,
Fig. 15.
Note the wire lengths of the lock release cable at
each end. The longer wire lengths will be used at
the bottom side of the locking paw.
32) Connect clevis end of the cable assembly to the
lever assembly using a clevis pin and (2) E-clips,
Fig. 15.
33) Route other end of lock cable up thru power side
column extension, over and thru idler side
column extension, and down to mounting
location on idler column.
Fig. 16-Lock Release
34) Attach lock cable mounting tab to idler column
using 5/16-18 Phillips pan head screw. Rotate
slightly to be in-line with connection to lock pawl
as shown in
Fig. 16
.
35) Assemble ½” O.D. short spring, lock pawl, and
clevis end of lock cable as shown in
Fig. 16
.
36) Mount lock cable to mounting tab using jam nuts.
37) Use wire ties provided to secure both lock cables
to the hydraulic hose.
A
RM
I
NSTALLATION
38) Extend the foot pad to both extents and apply
“anti-seize” to the retaining ring.
39) Arm restraint assemblies should be installed on
carriage as shown in
Fig. 17
.
Fig. 17-Arm Restraint
40) Install inner arm gear to bottom of arm using (2)
M10 x 25 Hex bolts as shown in
Fig. 18
. Do not
tighten bolts at this time.
Fig. 18-Inner Arm Gear
41) Lubricate the arm pin or carriage arm pin hole
with “anti-seize” and install the arms.
42) Adjust placement of inner arm gear until gears
fully engage with one another throughout the
rotation of the arm and tighten bolts.
43) Adjust the hex head bolt in the bottom of the arm
restraint shaft so the arm is allowed to rotate
freely when lift is completely lowered,
Fig. 19
.