Model CL12
Installation, Operation and Maintenance
Page
5
Rev. 10/23/19
CL12-IOM-A.doc
5) Layout the service bay according to the
architect’s plans or owner’s instructions
(see Fig.
1b
).
Failure to install in this orientation can
result in personal and property damage.
Be
certain that the proper conditions exist, see pg 3.
6) Assemble column extension to column by lining
up the correct set of holes and use the 3/8”-16 x
3/4" lg. hex flange head bolts,
Fig. 3.
Note: the
column extensions are adjustable by 6”,
except for the CL12-LC.
Repeat for opposite
column and extension.
7) Erect and align both column assemblies.
Fig. 3 – Column Extension Assembly
L
OCK
P
AWL
8) Install the lock components on the Power & Idler
columns as shown in
Fig. 4a & 4b
. The D-Ring
Connector will have to be bent closed.
Fig. 4a – Power Locking Pawl Assembly
Fig. 4b – Idler Locking Pawl Assembly
A
NCHORING
9) The anchor bolts must be installed at least 8”
from any crack, edge, or expansion joint.
10) Use a concrete hammer drill with a 3/4 inch
carbide bit. Tip diameter should conform to ANSI
Standard B94.12-1977 (.775 to .787). Do not use
excessively worn bits or bits which have been
incorrectly sharpened. A core bit may be
necessary if an obstruction is encountered.
Never substitute with shorter anchor.
11) Recheck “Inside of Columns” dimension,
Fig. 1
.
Drill the anchor holes using the base plate as a
template. Drill through the floor if possible or to a
depth of 5 inches minimum.
Complete steps 12 thru 15 for the six (6) exposed
anchors around each column, then raise the
carriages. Repeat steps 11 thru 15 for the two (2)
anchors under each carriage.
12) Vacuum dust from the hole for proper holding
power.
13) Shim both columns to plumb using the shims
provided as shown in
Fig. 5
. DO NOT shim more
than 1/2" at any given point. Use a level no less
than 24” in length to plumb columns.
14) Assemble washer and nut to anchor with nut just
below impact section of bolt. Drive anchor into
hole until nut and washer contact base.
Fig. 5 – Column Shimming
15) Tighten power column anchors and recheck
column for plumb. Re-shim if necessary. Torque
to
150 ft.-lbs.
to set anchors.