Model 15000-3S & 15000-SPRINTER
Installation, Operation and Maintenance
Page
7
Rev. 8/13/19
15-3S-IOM-A.doc
S
YNCHRONIZER
C
ABLES
17) Manually raise the carriages to a common lock
position, to gain access to the top of the
carriage.
Insure that the top of the hydraulic cylinder is
out of the way but still retained in the
opening of the top plate of the carriage as
shown in Fig. 8.
Failure to follow previous step
could result in personal injury.
Fig. 8 –
Cable Assembly
18) Route the synchronizer cables as shown in
Fig.
9
. Routing the cable from the inner hole location
on the top of the carriage down to the column
pulley and up to the overhead pulley. From the
other hole location rout the cable up to the
overhead pulley.
Fig. 9 – Cable Assembly/Cable Extensions
H
YDRAULICS
IMPORTANT – To insure proper hose fitting seal
without damage to the fitting follow this
procedure for each hose connection:
Screw flared
fitting on finger tight. Rotate flared fitting 1 1/2 hex
flats (90 deg.). Back the flared fitting off one full turn.
Again tighten flared fitting finger tight, then rotate
flared fitting 1 1/2 hex flats (90 deg.).
19) Mount Power Unit to power column as shown in
Fig 10
. The mounting hardware, (4) 5/16”-18NC
hex nuts, are pre-installed on power unit
mounting bracket.
Fig. 10 – Power Unit Mounting
20) Install 9/16”-18 O-ring elbow (
in hardware box
) into
power unit,
Fig. 10
.
CAUTION
do not damage
rubber O-ring.
21) Uncoil Idler Side hose and route through Idler
Side column extension as shown in
Fig 11
taking
care to avoid the synchronizing cables.
Fig. 11 – Power Unit Mounting
C A U T I O N