Model 15000-3S & 15000-SPRINTER
Installation, Operation and Maintenance
Page
9
Rev. 8/13/19
15-3S-IOM-A.doc
L
OCK
R
ELEASE
30) Assemble the fittings to the air valve,
Fig. 15
,
with the barbed fitting (3/8” hose barb x 1/8NPT)
in port marked “1”, the elbow (1/8” push-lock x
1/8NPT) in port “2”, and nothing in the center
port “3” (exhaust).
31) Assemble the palm button to the valve. Cut a
piece of the 1/8” O.D. air line 1 1/2" long and use
it to connect the center of the Tee fitting to the
elbow.
Fig. 15 – Cable Assembly
32) On the Power Column, attach the 1/8” air line
from the lock release air cylinder to the bottom of
the push-lock tee fitting,
Fig 16
.
33) Connect the rest of the 1/8” air line to the top of
the tee and run it along side the hydraulic hose
up the column and across the overhead
attaching it to the hydraulic hose with wire ties
(
Fig 16
).
34) At the Idler side feed the air line thru the opening
in the column extension and down the column
using adhesive tabs and wire ties. Attach it to
the lock release air cylinder (
Fig. 16
).
Fig. 16 – Lock Release
35) Remove the two nuts securing the right side of
the power unit, install the valve cover with these
nuts, and secure the hose to the cover with wire
ties,
Fig. 17
.
Fig. 17 – Cable Assembly