Model 15000-3S & 15000-SPRINTER
Installation, Operation and Maintenance
Page
11
Rev. 8/13/19
15-3S-IOM-A.doc
F
INAL
A
DJUSTMENTS
H
YDRAULICS
44) Lower the lift to the floor and raise the lift
approximately one foot.
45) Start with Idler side first. Slowly and carefully
loosen the bleed plug on top of the cylinder just
enough to allow the entrapped air to escape.
Repeat for power side.
46) Raise lift 6 inches. Repeat step 43 until no air
comes out of cylinder.
47) Pressure test hydraulic system. Energize power
unit, raise lift to full rise and continue to run
motor for additional 10 seconds. (NOTE:
pressure relief will make a high pitch squeal
sound for these 10 seconds.) Check hydraulic
system for leaks.
48) Energize power unit again for 10 seconds. With
a clean rag, wipe down both cylinder rods. (The
cylinders are shipped with a small amount of
clear anti-corosive lubricant that will be forced
out through the wiper when the lift reaches full
rise.)
If lubricant is not wiped clean from the
cylinder rod, the cylinder will apear to be
leaking
.
S
YNCHRONIZING
C
ABLES
49) Raise lift and insure carriages lower into same
lock position.
50) Adjust synchronizing cables so the tension is
equal in both cables and carriages are firmly
sitting on locks.
51)
Cycle lift to insure that latches operate
simultaneously. Adjust if necessary.
F
INAL
C
HECKOUT
P
ROCEDURE
52) Demonstrate the operation of the lift to the
owner/operator/employer using a typical vehicle
and review correct and safe lifting procedures
using the
Lifting It Right
booklet as a guide.
53) Return all provided literature (including this
manual) to the literature pack envelope and
deliver the envelope to the
owner/operator/employer.
54) Complete the online warranty registration (refer
to the included warranty statement).