Page. 41 of 73
Training manual :PIGMA Gal Evo
5.3
GAS REGULATIONS.
5.3.1
Supply pressure check.
.
1
.
Loosen screw “1”
(fig. A)
and insert the pressure gauge fitting pipe in the
pressure intake.
2
. Put the boiler on maximum operating power (hot water tap
open). The supply
pressure must correspond with the one foreseen for the type of gas for which the
boiler has been prearranged (refer to table below).
3
.
After checking tighten screw “1” and check the seal
5.3.2
Maximum sanitary power check
1.
To check maximum power, loosen screw “2”
(fig.B)
and insert the pressure gauge fitting pipe in the pressure
intake.
2.
Disconnect the compensation pipe of the air
chamber
(fig.B)
.
3.
Start the boiler at maximum power with the flue
cleaner function (press Reset button for 5 sec.).
4.
The supply pressure must correspond with the one
foreseen for the type of gas for which the boiler has
been prearranged (refer to table below). If it does not,
remove the protection cap and act on adjusting hexagon
nut “3”
(fig. C)
.
5.
After checking tighten screw “2” and check the seal.
6.
Reassemble the protection cap of the modulator.
7.
Reconnected the compensation pipe
MINIMUM SUPPLY PRESSURE
METHANE G 20
BUTHANE G 30
PROPANE G 31
17 mbar
25 mbar
25 mbar
OUTLET PRESSURE SANITARY MAX POWER (mbar)
G20
G30
G31
24 kW CF
12
27,8
35,6
28 kW CF
12,4
27,5
35,3
24 kW FF
12,7
28,1
35,7
28 kW FF
12,4
27,7
35,7
32 kW FF
11
28
35,8
Fig. A
Compensation
silicon pipe
Fig. B
Fig. C
Содержание PIGMA Gal Evo
Страница 10: ...Page 10 of 73 Training manual PIGMA Gal Evo...
Страница 52: ...Pag 52 de 73 Manuale Didattico ACO Training manual PIGMA Gal Evo...
Страница 56: ...Pag 56 de 73 Manuale Didattico ACO Training manual PIGMA Gal Evo 6 1 1 Diagramme lectronique FF boiler...
Страница 57: ...Pag 57 de 73 Manuale Didattico ACO Training manual PIGMA Gal Evo...
Страница 58: ...Pag 58 de 73 Manuale Didattico ACO Training manual PIGMA Gal Evo 6 1 2 Diagramme lectronique CF boiler...