FibeAir® IP-20E
Installation Guide
Ceragon Proprietary and Confidential
Page 6 of 52
1.
Before You Start
1.1
Important Notes
For the warranty to be honored, install the unit in accordance with the
instructions in this manual.
Any changes or modifications of equipment not expressly approved by the
manufacturer could void the user’s authority to operate the equipment
and the warranty for such equipment.
IP-20E is intended for installation in a restricted access location.
IP-20E must be installed and permanently connected to protective earth
by qualified service personnel in accordance with applicable national
electrical codes.
1.2
Safety Precautions & Declared Material
1.2.1
General Equipment Precautions
To avoid malfunctioning or personnel injuries, equipment or
accessories/kits/plug-in unit installation, requires qualified and
trained personnel. Changes or modifications not expressly approved
by Ceragon Networks could void the user's authority to operate the
equipment.
Where special cables, shields, adapters and grounding kits are
supplied or described in this manual, these items must be used, to
comply with the FCC regulations.
Use of controls, adjustments, or performing procedures other than
those specified herein, may result in hazardous radiation exposure.
When working with an IP-20E, note the following risk of electric
shock and energy hazard:
Disconnecting one power supply disconnects only one power supply
module. To isolate the unit completely, disconnect all power supplies.
Machine noise information order - 3. GPSGV, the highest sound
pressure level amounts to 70 dB (A) or less, in accordance with ISO
EN 7779.