FibeAir
®
IP-10 IDU Installation Guide
1-2
Inspection
Check the packing lists, and ensure that the correct part numbers and quantities of components arrived.
Unpacking Equipment at the Site
A single FibeAir system (1+0) is shipped in 5 crates. Upon delivery, make sure that the following items are
included:
Two indoor units and accessories
Two outdoor units
One CD with a management user guide.
Unpack the contents and check for damaged or missing parts. If any part is damaged or missing, contact your
local distributor.
Installation Requirements
Required Tools
The following tools are required to install the IDU:
Philips screwdriver (for mounting the IDU to the rack and grounding screw)
Flathead small screwdriver (for PSU connector)
Sharp cutting knife (for wire stripping)
Crimping tool for ground cable lug crimping (optional: if alternative grounding cable is used).
Cables
In addition to the tools mentioned above, the interface connectors and their pin-outs, can be found in the
following sections in this guide:
Appendix A: Line Interfaces
Appendix B: Connector Pin-Outs