FibeAir
®
IP-10 Installation Guide
1-1
Chapter 1: Installation
General
This chapter provides instructions for the installation of the FibeAir IP-10 IDU at the customer site.
Site Requirements
Must be located indoors.
The environment temperature must be between -5 C and +55 C.
Easily accessible, but only by authorized personnel.
Available power source of -48 VDC, and the site must comply with National Electric Code (NEC)
standards.
Available management connection (Ethernet or dial-up).
No more than 300 m from RFU location.
In addition, since the IDU will be connected to the RFU, when considering a site, it is important to check for
current and future obstacles on the roof or tower. Possible future obstacles may include trees, new buildings,
window cleaners on the roof, snow that may accumulate in front of the antenna, etc. The site should be
accessible to certified personnel only.
Note about Antenna Location:
As with any type of construction, a local permit may be required before
installing an antenna. It is the owner’s responsibility to obtain any and all permits.
Pre-Installation
Packing
The equipment is packed at the factory, and sealed moisture-absorbing bags are inserted.
Transportation
y
The equipment is prepared for public transportation. The cargo must be kept dry during transportation,
in accordance with ETS 300 019-1-2, Class 2.3.
y
It is recommended to transport the equipment to the installation site in its original packing case.
y
If intermediate storage is required, the packed equipment must be stored in dry and cool conditions and
out of direct sunlight, in accordance with ETS 300 019-1-1, Class 1.2.