Cembre LD-2ENY Скачать руководство пользователя страница 14

13

22

6.1)  Assembling the broachcutters  (Ref. to Figs. 8-11)
6.1.1)  Insert the pilot bit in the cutter from the side of the spigot.
6.1.2)  Using the lever (36), position the spindle shaft (07) so that both grub screws (18) 

become accessible and suffi cient space is provided to insert the cutter; if necessary rotate 
the spindle shaft manually and suffi ciently by inserting the 4 mm male hexagon key in the 
appropriate intermediate gear housing (30) in the crankcase of the drill corresponding to 
the feed handle (71) (see Fig. 11).

6.1.3)  Insert the cutter in the spindle shaft so that the two engaging dogs on the cutter 

spigot line up with the grub screws.

6.1.4)  Clamp the cutter by fully tightening the grub screws by means of the 4 mm male 

hexagon key.

6.1.5)  Check that the guide bit slides freely by applying slight pressure on it.

6.2)  Assembling the special spiral bits  (Ref. to Figs. 9 - 11)
6.2.1)  Using the advance lever, position the spindle shaft so that both grub screws beco-
me accessible and suffi cient space is provided to insert the spiral bit; if necessary rotate 
the spindle shaft manually and suffi ciently by inserting the 4 mm male hexagon key in the 
appropriate intermediate gear housing in the crankcase of the drill corresponding to the 
feed handle (71) (see Fig. 11).

Engaging dogs

07

18

FIG. 8 – ASSEMBLING THE CUTTERS

10. SPECIAL APPLICATIONS FOR Cembre  RAIL DRILLS 

*

 = Application developed for narrow chairs

1 = For drilling 56 lb aluminium bar manufactered by FOSTER 
2 = For drilling 84 lb aluminium bar manufactered by FOSTER 
3 = For drilling 84 lb aluminium bar manufactered by PORTER 

DBG-LY over rail clamp 
and the specifi c shoes  
(combination) allows 
the positioning on  both 
sides of the rails. Use of 
2" depth of cut broach 
cutters

–  Use on girder rail  (Ref. to Fig. 21 a-b, example for 128 GR or GGR 118)

–  Use on running rails  (Ref. to Fig. 22) 
    (narrow passage of the articulated arm)
  Drilling by the guard rail DBG-GR 
  over rail clamp equipped with TDB 1 termination

9. EXAMPLE OF SPECIAL

RAIL DRILL APPLICATIONS

FIG. 22

FIG. 21b – Side 2 

FIG. 21a – Side 1 

 MPAF 85 LB ASCE

Pilot bit PPC 2

Pilot bit PPL 2

Short type broach cutter
Maximum drilling thickness: 7/8"

Long type broach cutter
Maximum drilling thickness: 2" 

6. PREPARING THE RAIL DRILL

Содержание LD-2ENY

Страница 1: ...nce T l 01 60 49 11 90 Fax 01 60 49 29 10 B P 37 91421 Morangis C dex E mail info cembre fr www cembre fr Cembre Espa a S L Calle Verano 6 y 8 P I Las Monjas 28850 Torrej n de Ardoz Madrid Espa a Tel...

Страница 2: ...neral characteristics 2 2 Accessories supplied with the rail drill 3 3 Optional accessories to be ordered separately 4 4 Type SR5000 coolant unit 10 5 Spindle advancing lever 12 6 Preparing the rail d...

Страница 3: ...e page 28 RAIL DRILL TYPE LD 2ENY NOTES ATTENTION Before using the rail drilling carefully read the instructions contained in this manual SAVE THESE INSTRUCTIONS this manual contains important safety...

Страница 4: ...ving the drilling swarf 2 8 4 7 fl oz 140 ml oil tank for the gear reduction 2 9 Type SR5000 coolant unit Accessories from pos 2 1 to pos 2 8 are included in the Kit of accessories for LD 2ENYY having...

Страница 5: ...ings complete with the TDB 6 termination Always supplied with rail drill ref LD 2EY 3 1 2 DBG GR device for clamping the rail drill in correspondance of guard rail complete with theTDB 1 termination A...

Страница 6: ...4 H FIG 27 DBG Y RAIL WEB CLAMPING DEVICE 6001154 6700524 6040421 6001155 6001156 6760378 6340612 6900314 6650144 6900348 6760222 6140082 6001775 6001751 6001756 6001754 6340160 6380310 6001150 60016...

Страница 7: ...64 100 LB RE 2 45 64 100 LB RE HF 2 45 64 100 LB PRR 2 9 32 100 LB PS 2 31 64 105 LB DY 110 LB RE 2 43 64 112 115 119 LB RE 2 7 8 122 CB 2 7 8 127 LB DY 3 1 8 130 LB RE HF A 2 3 4 130 LB RE HF 3 1 16...

Страница 8: ...WA is equal to 96 6 dB A Protection of operators against risksof exposure to noise during work Cembre drills type LD 2EY are designed and constructed according to EEC directives 80 1107 and 86 188 rel...

Страница 9: ...y of the drill clamp and correct assembly of the cutter bit Suitable lubrocooling lubrication cooling to keep the temperature of the tool low so as not to compromise the efficiency of the cutting edge...

Страница 10: ...3 8 Y included in the APED 130 included in the APED 135 165 DPE DPE included in the APED 130 DPE DPE DPE DPE DPE not required not required not required not required not required not required TST50 DB...

Страница 11: ...screw it back in the appropriate housing FIG 24 REMOVAL OF METALLIC RESIDUE 21 13 MAINTENANCE The type SR5000 coolant unit consists of a tank complete with tube and maximum pressure valve 01 fitted w...

Страница 12: ...manual external cooling when cutters are used to enlarge existing holes or when using spiral bits not de signed for automatic cooling If necessary the ARE adaptor can also be used to clean various par...

Страница 13: ...th the release pawl 39 pressed the lever is releasedfromitshubandcanrepeattheprevious travel without the spindle moving 11 STORING THE RAIL DRILL When work has been completed store the drill by procee...

Страница 14: ...rovided to insert the spiral bit if necessary rotate the spindle shaft manually and sufficiently by inserting the 4 mm male hexagon key in the appropriate intermediate gear housing in the crankcase of...

Страница 15: ...l then switched off after drilling by closing the tap FIG 20a COOLING DRILLING WITH SPIRAL BIT use only for APE do not required for APED 6 2 2 Insert into the spindle shaft the DPE spacer required to...

Страница 16: ...dfinallyrelievingthepressurein the exit phase When drilling close to raised markings on the rail the initial pressure must be extremely light until the markings disappear otherwise the cutter may be d...

Страница 17: ...drill fitted with short type broach cutter depth of cut 7 8 The drilling sequence may be started with the drill fitted with the broach cutter 6 1 positioning shoe 7 3 the drill being clamped to the r...

Страница 18: ...n the element to be drilled To position the drilling machine complete with the clamping termination 7 1 and the positioning template 7 3 suitable for the type of rail to be drilled proceed as follows...

Отзывы: