Cembre LD-2ENY Скачать руководство пользователя страница 13

23

12

FIG. 23 - STORAGE CASE

VAL MPA

VAL LD

LD-2EY

FIG. 6

The spindle is advanced by moving the lever 
(36) (See Fig. 6 a). The lever is fi tted with 
a release pawl (39) which, when pressed, 
renders it independent of the hub and hence 
the spindle; the operator can therefore easily 
vary the angular position of the lever without 
movement of the spindle (Fig.6).

6c - With the hub released, moving the lever
    towards the operator causes a corre-
 

  sponding advance of the spindle.

6a  -  Moving the lever (36) towards the operator;
 

  corresponding advance of the spindle.

FIG. 7

5.1) Adjustment of the advance lever

The movement of the lever must never be 
loose
, for adjustment proceed to tighten it by 
loading the cup springs by means of the as-
sociated self-locking nut, after removing the 
protective cap (see Fig. 7).

SELF-LOCKING NUT

6b -  With the release pawl (39) pressed, the lever is
 

  released from its hub and can repeat the previous 

 

  travel without the spindle moving.  

11. STORING THE RAIL DRILL

When work has been completed, store the drill by proceeding as follows:

11.1)  Depressurise the tank of the SR5000 coolant unit (see § 4), close the tap (02) on 
 

the hose and disconnect the quick-coupling (03).

11.2)  Carefully clean the machine, particularly in the spindle area, removing machining
 

waste (swarf, etc.) and any deposits of lubrocoolant.

11.3)  Fully withdraw the spindle.

11.4)  Place the rail drill and the SR5000 coolant unit in a sealed place free from dust, 
 

moisture and the risk of accidental impact.

For better protection 

Cembre

 recommends the use of the VAL LD metal case designed 

for this purpose (see § 3.3). The DBG-Y moving arm device allows the drill to be housed 
and locked in the case. A suitable housing is also provided in this VAL LD for the VAL 
MPA
 box containing the most commonly used accessories.

5. SPINDLE ADVANCE LEVER  (Ref. to Fig. 6)

Содержание LD-2ENY

Страница 1: ...nce T l 01 60 49 11 90 Fax 01 60 49 29 10 B P 37 91421 Morangis C dex E mail info cembre fr www cembre fr Cembre Espa a S L Calle Verano 6 y 8 P I Las Monjas 28850 Torrej n de Ardoz Madrid Espa a Tel...

Страница 2: ...neral characteristics 2 2 Accessories supplied with the rail drill 3 3 Optional accessories to be ordered separately 4 4 Type SR5000 coolant unit 10 5 Spindle advancing lever 12 6 Preparing the rail d...

Страница 3: ...e page 28 RAIL DRILL TYPE LD 2ENY NOTES ATTENTION Before using the rail drilling carefully read the instructions contained in this manual SAVE THESE INSTRUCTIONS this manual contains important safety...

Страница 4: ...ving the drilling swarf 2 8 4 7 fl oz 140 ml oil tank for the gear reduction 2 9 Type SR5000 coolant unit Accessories from pos 2 1 to pos 2 8 are included in the Kit of accessories for LD 2ENYY having...

Страница 5: ...ings complete with the TDB 6 termination Always supplied with rail drill ref LD 2EY 3 1 2 DBG GR device for clamping the rail drill in correspondance of guard rail complete with theTDB 1 termination A...

Страница 6: ...4 H FIG 27 DBG Y RAIL WEB CLAMPING DEVICE 6001154 6700524 6040421 6001155 6001156 6760378 6340612 6900314 6650144 6900348 6760222 6140082 6001775 6001751 6001756 6001754 6340160 6380310 6001150 60016...

Страница 7: ...64 100 LB RE 2 45 64 100 LB RE HF 2 45 64 100 LB PRR 2 9 32 100 LB PS 2 31 64 105 LB DY 110 LB RE 2 43 64 112 115 119 LB RE 2 7 8 122 CB 2 7 8 127 LB DY 3 1 8 130 LB RE HF A 2 3 4 130 LB RE HF 3 1 16...

Страница 8: ...WA is equal to 96 6 dB A Protection of operators against risksof exposure to noise during work Cembre drills type LD 2EY are designed and constructed according to EEC directives 80 1107 and 86 188 rel...

Страница 9: ...y of the drill clamp and correct assembly of the cutter bit Suitable lubrocooling lubrication cooling to keep the temperature of the tool low so as not to compromise the efficiency of the cutting edge...

Страница 10: ...3 8 Y included in the APED 130 included in the APED 135 165 DPE DPE included in the APED 130 DPE DPE DPE DPE DPE not required not required not required not required not required not required TST50 DB...

Страница 11: ...screw it back in the appropriate housing FIG 24 REMOVAL OF METALLIC RESIDUE 21 13 MAINTENANCE The type SR5000 coolant unit consists of a tank complete with tube and maximum pressure valve 01 fitted w...

Страница 12: ...manual external cooling when cutters are used to enlarge existing holes or when using spiral bits not de signed for automatic cooling If necessary the ARE adaptor can also be used to clean various par...

Страница 13: ...th the release pawl 39 pressed the lever is releasedfromitshubandcanrepeattheprevious travel without the spindle moving 11 STORING THE RAIL DRILL When work has been completed store the drill by procee...

Страница 14: ...rovided to insert the spiral bit if necessary rotate the spindle shaft manually and sufficiently by inserting the 4 mm male hexagon key in the appropriate intermediate gear housing in the crankcase of...

Страница 15: ...l then switched off after drilling by closing the tap FIG 20a COOLING DRILLING WITH SPIRAL BIT use only for APE do not required for APED 6 2 2 Insert into the spindle shaft the DPE spacer required to...

Страница 16: ...dfinallyrelievingthepressurein the exit phase When drilling close to raised markings on the rail the initial pressure must be extremely light until the markings disappear otherwise the cutter may be d...

Страница 17: ...drill fitted with short type broach cutter depth of cut 7 8 The drilling sequence may be started with the drill fitted with the broach cutter 6 1 positioning shoe 7 3 the drill being clamped to the r...

Страница 18: ...n the element to be drilled To position the drilling machine complete with the clamping termination 7 1 and the positioning template 7 3 suitable for the type of rail to be drilled proceed as follows...

Отзывы: